Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
407 712 18.00 1220.00 2440.00 FA E2 BB CC 0 / 30
406 587 18.00 1220.00 2440.00 MA B4 G1 0 / 35
405 539 17.60 1220.00 2440.00 MA B4 G1 0 / 40
404 580//538 17.60 1220.00 2440.00 MA B4 G1 0 / 40
403 574 17.60 920.00 2440.00 MA B4 G1 0 / 40
402 686 11.60 915.00 1830.00 FA B4 G2 0 / 37
401 696 11.60 915.00 1830.00 FA B4 G2 0 / 40
400 613 11.60 915.00 1830.00 FA B4 G2 0 / 60
399 592 18.00 1220.00 2440.00 FA E2 BB CC 0 / 35
398 647 2.70 1220.00 2440.00 FA E1 UTY 0 / 196

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
152 135 2026-08-31 M:Agustus / W:36 402 Shift B P1.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
151 134 2026-09-01 M:September / W:36 423 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 59 P:0 / B:59 O:0 / B:59 0.017749 1.047201 Del
150 133 2026-09-01 M:September / W:36 391 Shift B P1.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 62 P:0 / B:62 O:0 / B:62 0.017749 1.100449 Del
149 132 2026-09-02 M:September / W:36 818 Shift A P1.CU.10 20.50 x 915.00 x 1830.00 MA B4 G1 20 P:15 / B:5 O:0 / B:5 0.032652 0.653036 Del
148 131 2026-09-01 M:September / W:36 804 Shift A P1.CU.3 20.50 x 915.00 x 1830.00 MA B4 G1 30 P:0 / B:30 O:0 / B:30 0.032652 0.979553 Del
147 130 2026-09-01 M:September / W:36 359 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
146 129 2026-08-31 M:Agustus / W:36 381 Shift B P1.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
145 128 2026-09-01 M:September / W:36 408 Shift A P1.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
144 127 2026-09-01 M:September / W:36 407 Shift B P1.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
143 126 2026-09-01 M:September / W:36 386 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del