Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
334 x//301 18.00 1220.00 2440.00 FM E1 UTY E 0 / 31
333 456/x 18.00 1220.00 2440.00 FM E1 UTY E 0 / 32
332 548 5.00 1220.00 2440.00 FA E2 CI D2 0 / 100
331 594 5.00 1220.00 2440.00 FA E2 CI D2 0 / 107
330 595 2.70 1220.00 2440.00 FA E2 CI D2 0 / 200
329 608 2.70 1220.00 2440.00 FA E2 CI D2 0 / 200
328 531 2.70 1220.00 2440.00 FA E2 CI D2 0 / 220
327 603 2.70 1220.00 2440.00 FA E2 CI D2 0 / 200
326 596 2.70 1220.00 2440.00 FA E2 CI D2 0 / 196
325 541 5.00 1220.00 2440.00 FA E2 CI D2 0 / 100

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
118 101 2026-09-01 M:September / W:36 320 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 MA B4 G1 34 P:0 / B:34 O:0 / B:34 0.031813 1.081632 Del
117 100 2026-09-01 M:September / W:36 337 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 40 P:1 / B:39 O:0 / B:39 0.031813 1.272509 Del
116 99 2026-09-01 M:September / W:36 343 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.031813 1.908763 Del
115 98 2026-09-01 M:September / W:36 349 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 61 P:0 / B:61 O:0 / B:61 0.031813 1.940576 Del
114 97 2026-09-01 M:September / W:36 358/353 Shift A P1.CU.1 17.60 x 1230.00 x 2440.00 MA B4 G1 40 P:0 / B:40 O:0 / B:40 0.049820 1.992797 Del
113 96 2026-09-02 M:September / W:36 726 Shift A P1.CU.2 14.60 x 1230.00 x 2440.00 MA B4 G1 40 P:0 / B:40 O:0 / B:40 0.040816 1.632653 Del
112 95 2026-09-01 M:September / W:36 372 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:0 / B:50 0.022897 1.144848 Del
111 94 2026-09-01 M:September / W:36 231 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 42 P:1 / B:41 O:0 / B:41 0.022897 0.961672 Del
110 93 2026-09-01 M:September / W:36 373 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:0 / B:50 0.022897 1.144848 Del
109 92 2026-09-01 M:September / W:36 297+368 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:0 / B:50 0.022897 1.144848 Del