Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
194 481 2.70 915.00 1830.00 FJB E1 UTY E 0 / 200
193 470//480 2.70 915.00 1830.00 FJB E1 UTY E 0 / 196
192 370//470 2.70 915.00 1830.00 FJB E1 UTY E 0 / 190
191 453/x 11.60 1230.00 2440.00 FA B4 G2 0 / 60
190 454//453 11.60 1230.00 2440.00 FA B4 G2 0 / 60
189 454 11.60 1230.00 2440.00 FA B4 G2 0 / 60
188 457 11.60 1230.00 2440.00 FA B4 G2 0 / 53
187 482 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
186 433 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
185 441 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
118 101 2026-09-01 M:September / W:36 320 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 MA B4 G1 34 P:0 / B:34 O:0 / B:34 0.031813 1.081632 Del
117 100 2026-09-01 M:September / W:36 337 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 40 P:1 / B:39 O:0 / B:39 0.031813 1.272509 Del
116 99 2026-09-01 M:September / W:36 343 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.031813 1.908763 Del
115 98 2026-09-01 M:September / W:36 349 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 61 P:0 / B:61 O:0 / B:61 0.031813 1.940576 Del
114 97 2026-09-01 M:September / W:36 358/353 Shift A P1.CU.1 17.60 x 1230.00 x 2440.00 MA B4 G1 40 P:0 / B:40 O:0 / B:40 0.049820 1.992797 Del
113 96 2026-09-02 M:September / W:36 726 Shift A P1.CU.2 14.60 x 1230.00 x 2440.00 MA B4 G1 40 P:0 / B:40 O:0 / B:40 0.040816 1.632653 Del
112 95 2026-09-01 M:September / W:36 372 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:0 / B:50 0.022897 1.144848 Del
111 94 2026-09-01 M:September / W:36 231 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 42 P:1 / B:41 O:0 / B:41 0.022897 0.961672 Del
110 93 2026-09-01 M:September / W:36 373 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:0 / B:50 0.022897 1.144848 Del
109 92 2026-09-01 M:September / W:36 297+368 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:0 / B:50 0.022897 1.144848 Del