Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
599 642 11.00 1220.00 2440.00 FM PENOL MAHONI 0 / 2
598 693//692 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 100
597 642 11.00 1220.00 2440.00 FM E1 UTY E 0 / 2
596 497 3.00 1220.00 2440.00 FM E1 UTY E 0 / 4
595 664 11.60 1220.00 2440.00 MA B4 G1 0 / 63
594 63 15.00 1220.00 2440.00 FA B4 BB CC 0 / 50
593 597 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 108
592 471//476 15.00 1220.00 2440.00 FA B4 CI 17 0 / 50
591 130 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 95
590 120 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 101

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
122 105 2026-09-01 M:September / W:36 251/237 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 33 P:0 / B:33 O:0 / B:33 0.022897 0.755600 Del
121 104 2026-09-01 M:September / W:36 251 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:0 / B:50 0.022897 1.144848 Del
120 103 2026-09-01 M:September / W:36 371 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:0 / B:50 0.022897 1.144848 Del
119 102 2026-09-01 M:September / W:36 382 Shift A P1.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 22 P:0 / B:22 O:0 / B:22 0.041675 0.916854 Del
118 101 2026-09-01 M:September / W:36 320 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 MA B4 G1 34 P:0 / B:34 O:0 / B:34 0.031813 1.081632 Del
117 100 2026-09-01 M:September / W:36 337 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 40 P:1 / B:39 O:0 / B:39 0.031813 1.272509 Del
116 99 2026-09-01 M:September / W:36 343 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.031813 1.908763 Del
115 98 2026-09-01 M:September / W:36 349 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 61 P:0 / B:61 O:0 / B:61 0.031813 1.940576 Del
114 97 2026-09-01 M:September / W:36 358/353 Shift A P1.CU.1 17.60 x 1230.00 x 2440.00 MA B4 G1 40 P:0 / B:40 O:0 / B:40 0.049820 1.992797 Del
113 96 2026-09-02 M:September / W:36 726 Shift A P1.CU.2 14.60 x 1230.00 x 2440.00 MA B4 G1 40 P:0 / B:40 O:0 / B:40 0.040816 1.632653 Del