Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
254 302 9.00 1220.00 2440.00 FA E2 LKL UTY KRUING 0 / 30
253 x 9.00 1220.00 2440.00 FM E2 CI 17 0 / 30
252 x 9.00 1220.00 2440.00 FM E2 CI 17 0 / 62
251 218 9.00 1220.00 2440.00 FM E2 CI 17 0 / 85
250 x 9.00 1220.00 2440.00 FM E2 CI 17 0 / 84
249 x 9.00 1220.00 2440.00 FM E2 CI 17 0 / 60
248 546 15.00 1220.00 2440.00 FA B4 CI 17 0 / 39
247 x 3.70 1230.00 2440.00 FM B4 G1.5 0 / 200
246 478//471 15.00 1220.00 2440.00 FA B4 CI 17 0 / 50
245 420//478 15.00 1220.00 2440.00 FA B4 CI 17 0 / 50

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
98 81 2026-08-31 M:Agustus / W:36 341 Shift B P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 59 P:1 / B:58 O:0 / B:58 0.031813 1.876950 Del
97 80 2026-09-01 M:September / W:36 353/352 Shift A P1.CU.1 17.60 x 1230.00 x 2440.00 MA B4 G1 23 P:0 / B:23 O:0 / B:23 0.049820 1.145858 Del
96 79 2026-09-01 M:September / W:36 327 Shift A P1.CU.1 17.60 x 1230.00 x 2440.00 MA B4 G1 40 P:23 / B:17 O:0 / B:17 0.049820 1.992797 Del
95 78 2026-09-01 M:September / W:36 257 Shift A P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 31 P:0 / B:31 O:0 / B:31 0.041675 1.291931 Del
94 77 2026-08-31 M:Agustus / W:36 259 Shift B P1.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 50 P:1 / B:49 O:0 / B:49 0.041675 2.083760 Del
93 76 2026-08-31 M:Agustus / W:36 726/41 Shift B P1.CU.1 14.60 x 1230.00 x 2440.00 MA B4 G1 29 P:4 / B:25 O:0 / B:25 0.040816 1.183673 Del
92 75 2026-09-01 M:September / W:36 257/382 Shift A P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 50 P:3 / B:47 O:0 / B:47 0.041675 2.083760 Del
91 74 2026-08-31 M:Agustus / W:36 124 Shift B P1.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:9 / B:191 O:191 / B:0 0.003181 0.636291 Del
90 73 2026-08-31 M:Agustus / W:36 135 Shift B P1.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:0 / B:200 O:200 / B:0 0.003181 0.636291 Del
89 72 2026-08-31 M:Agustus / W:36 126 Shift B P1.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:0 / B:200 O:200 / B:0 0.003181 0.636291 Del