Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 396 | 663 | 2.70 | 1220.00 | 2440.00 | FA E1 UTY | 0 / 204 | |
| 395 | 623 | 2.70 | 1220.00 | 2440.00 | FA E1 UTY | 0 / 202 | |
| 394 | 658 | 2.70 | 1220.00 | 2440.00 | FA E1 UTY | 0 / 204 | |
| 393 | 616 | 11.60 | 915.00 | 1830.00 | FA B4 G2 | 0 / 55 | |
| 392 | 612 | 11.60 | 915.00 | 1830.00 | FA B4 G2 | 0 / 50 | |
| 391 | 617 | 11.60 | 915.00 | 1830.00 | FA B4 G2 | 0 / 62 | |
| 390 | 530 | 20.50 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 18 | |
| 389 | x | 11.20 | 1220.00 | 2440.00 | FM E1 BB CC | 0 / 12 | |
| 388 | 105 | 11.20 | 1220.00 | 2440.00 | FM E1 BB CC | 0 / 40 | |
| 387 | 579 | 11.20 | 1220.00 | 2440.00 | FM E1 BB CC | 0 / 45 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 72 | 52 | 2026-08-29 | M:Agustus / W:35 | 236 | Shift A | P1.CU.3 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 198 | P:5 / B:193 | O:0 / B:193 | 0.003181 | 0.629928 | Del |
| 71 | 50 | 2026-08-29 | M:Agustus / W:35 | 10 | Shift B | P1.CU.2 | 6.00 x 1220.00 x 2440.00 | FA E2 BB CC | 93 | P:0 / B:93 | O:0 / B:93 | 0.014884 | 1.384212 | Del |