Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 366 | x | 2.70 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 118 | |
| 365 | 552 | 2.70 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 194 | |
| 364 | 489 | 2.70 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 200 | |
| 363 | 625 | 2.70 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 199 | |
| 362 | 605 | 6.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 80 | |
| 361 | 572 | 15.00 | 1220.00 | 2440.00 | FA B4 CI 17 | 0 / 50 | |
| 360 | x | 3.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 200 | |
| 359 | x | 3.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 199 | |
| 358 | 312 | 3.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 176 | |
| 357 | 537 | 17.60 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 40 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 72 | 52 | 2026-08-29 | M:Agustus / W:35 | 236 | Shift A | P1.CU.3 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 198 | P:5 / B:193 | O:0 / B:193 | 0.003181 | 0.629928 | Del |
| 71 | 50 | 2026-08-29 | M:Agustus / W:35 | 10 | Shift B | P1.CU.2 | 6.00 x 1220.00 x 2440.00 | FA E2 BB CC | 93 | P:0 / B:93 | O:0 / B:93 | 0.014884 | 1.384212 | Del |