Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 286 | 440//410 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 258 | |
| 285 | 450//440 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 178 | |
| 284 | 561 | 15.00 | 1220.00 | 2440.00 | FA B4 CI 17 | 0 / 50 | |
| 283 | 577 | 15.00 | 1220.00 | 2440.00 | FA B4 CI 17 | 0 / 45 | |
| 282 | 507 | 2.70 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 198 | |
| 281 | 495 | 2.70 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 199 | |
| 280 | 564 | 20.50 | 920.00 | 1830.00 | MA B4 G1 | 0 / 19 | |
| 279 | 827 | 20.50 | 920.00 | 1830.00 | MA B4 G1 | 0 / 29 | |
| 278 | 392 | 11.60 | 910.00 | 1820.00 | FA B4 G2 | 0 / 60 | |
| 277 | 506 | 11.60 | 910.00 | 1820.00 | FA B4 G2 | 0 / 60 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 72 | 52 | 2026-08-29 | M:Agustus / W:35 | 236 | Shift A | P1.CU.3 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 198 | P:5 / B:193 | O:0 / B:193 | 0.003181 | 0.629928 | Del |
| 71 | 50 | 2026-08-29 | M:Agustus / W:35 | 10 | Shift B | P1.CU.2 | 6.00 x 1220.00 x 2440.00 | FA E2 BB CC | 93 | P:0 / B:93 | O:0 / B:93 | 0.014884 | 1.384212 | Del |