Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 712 | X | 18.00 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 12 | |
| 711 | X | 18.00 | 1220.00 | 2440.00 | FA B4 G1 | 0 / 9 | |
| 710 | x | 8.20 | 1220.00 | 2440.00 | FM E1 | 0 / 31 | |
| 709 | x | 11.20 | 1220.00 | 2440.00 | FM E1 | 0 / 13 | |
| 708 | X | 8.60 | 1220.00 | 2440.00 | FA B4 G1 | 0 / 16 | |
| 707 | X | 20.50 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 7 | |
| 706 | X | 20.50 | 915.00 | 1830.00 | MA B4 G1 | 1 / 1 | |
| 705 | X | 14.60 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 50 | |
| 704 | X | 14.60 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 11 | |
| 703 | X | 14.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 33 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 72 | 52 | 2026-08-29 | M:Agustus / W:35 | 236 | Shift A | P1.CU.3 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 198 | P:5 / B:193 | O:0 / B:193 | 0.003181 | 0.629928 | Del |
| 71 | 50 | 2026-08-29 | M:Agustus / W:35 | 10 | Shift B | P1.CU.2 | 6.00 x 1220.00 x 2440.00 | FA E2 BB CC | 93 | P:0 / B:93 | O:0 / B:93 | 0.014884 | 1.384212 | Del |