Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 124 | 50 | 11.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 60 | |
| 123 | 375 | 11.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 60 | |
| 122 | 230 | 18.00 | 1220.00 | 2440.00 | FM E2 LKL C11 7 | 0 / 19 | |
| 121 | 234 | 18.00 | 1220.00 | 2440.00 | FM E2 LKL C11 7 | 0 / 23 | |
| 120 | 999 | 6.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 100 | |
| 119 | 136 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 | |
| 118 | 111 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 | |
| 117 | 114 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 | |
| 116 | 106 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 | |
| 115 | 107 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 80 | 63 | 2026-08-29 | M:Agustus / W:35 | 8382 | Shift A | P1.CU.1 | 3.70 x 1230.00 x 2440.00 | FM B4 G1 | 200 | P:0 / B:200 | O:200 / B:0 | 0.009604 | 1.920768 | Del |
| 79 | 61 | 2026-09-02 | M:September / W:36 | x | Shift A | P1.CU.1 | 2.70 x 1220.00 x 2440.00 | FA E2 D1 D2 | 200 | P:1 / B:199 | O:199 / B:0 | 0.006549 | 1.309792 | Del |
| 78 | 58 | 2026-08-29 | M:Agustus / W:35 | 8384 | Shift A | P1.CU.3 | 3.70 x 1230.00 x 2440.00 | FM B4 G1 | 200 | P:1 / B:199 | O:199 / B:0 | 0.009604 | 1.920768 | Del |
| 77 | 57 | 2026-08-29 | M:Agustus / W:35 | 8383 | Shift A | P1.CU.2 | 3.70 x 1230.00 x 2440.00 | FM B4 G1 | 200 | P:0 / B:200 | O:0 / B:200 | 0.009604 | 1.920768 | Del |
| 76 | 56 | 2026-08-29 | M:Agustus / W:35 | 316 | Shift A | P1.CU.3 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 200 | P:11 / B:189 | O:0 / B:189 | 0.003181 | 0.636291 | Del |
| 75 | 55 | 2026-08-29 | M:Agustus / W:35 | 315 | Shift A | P1.CU.2 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 200 | P:6 / B:194 | O:0 / B:194 | 0.003181 | 0.636291 | Del |
| 74 | 54 | 2026-08-29 | M:Agustus / W:35 | 314 | Shift A | P1.CU.2 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 200 | P:3 / B:197 | O:0 / B:197 | 0.003181 | 0.636291 | Del |
| 73 | 53 | 2026-08-29 | M:Agustus / W:35 | 110 | Shift A | P1.CU.7 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 199 | P:1 / B:198 | O:0 / B:198 | 0.003181 | 0.633110 | Del |
| 72 | 52 | 2026-08-29 | M:Agustus / W:35 | 236 | Shift A | P1.CU.3 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 198 | P:5 / B:193 | O:0 / B:193 | 0.003181 | 0.629928 | Del |
| 71 | 50 | 2026-08-29 | M:Agustus / W:35 | 10 | Shift B | P1.CU.2 | 6.00 x 1220.00 x 2440.00 | FA E2 BB CC | 93 | P:0 / B:93 | O:0 / B:93 | 0.014884 | 1.384212 | Del |