Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
399 689 2.70 920.00 1830.00 ALAS B4 0 / 204
398 624 2.70 1220.00 2440.00 FA E1 UTY 105 / 198
397 x 14.60 1220.00 2440.00 MA B4 G1 0 / 39
395 666 2.70 1220.00 2440.00 FA E1 UTY 170 / 198
394 664 11.60 1220.00 2440.00 MA B4 G1 0 / 63
393 651 11.60 1220.00 2440.00 MA B4 G1 39 / 39
392 646 2.70 1220.00 2440.00 FA E1 UTY 15 / 187
391 294 2.70 1220.00 2440.00 FA E2 D1 D2 0 / 196
390 477 11.60 910.00 1820.00 FA B4 G2 0 / 34
389 491//483 18.00 1220.00 2440.00 FM E2 CI 17 0 / 40
Total: 536 data
< Prev Halaman 18 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
537 460 2026-09-16 M:9 / W:38 842 Shift B P2.CU.4 18.00 x 1220.00 x 2440.00 FA E1 UTY 21 P:0 / B:21 O:0 / B:0 0.050606 1.062718 Del
535 459 2026-09-16 M:9 / W:38 x Shift B P2.CU.4 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:48 / B:152 O:0 / B:0 0.006549 1.309792 Del
532 456 2026-09-16 M:9 / W:38 496 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 226 P:49 / B:177 O:0 / B:0 0.006549 1.480065 Del
530 310 2026-09-16 M:9 / W:38 634 Shift B P2.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 27 P:1 / B:26 O:0 / B:15 0.022773 0.614858 Del
528 454 2026-09-16 M:9 / W:38 766 Shift B P2.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 34 P:0 / B:34 O:0 / B:0 0.022773 0.774266 Del
526 312 2026-09-16 M:9 / W:38 722 Shift B P2.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 42 P:0 / B:42 O:0 / B:0 0.022773 0.956446 Del
524 451 2026-09-16 M:9 / W:38 662 Shift B P2.CU.2 5.00 x 915.00 x 1830.00 FM E2 LKL C11 7 46 P:0 / B:46 O:0 / B:0 0.006698 0.308099 Del
523 450 2026-09-16 M:9 / W:38 838 Shift B P2.CU.5 2.70 x 1220.00 x 2440.00 FA E1 UTY 56 P:8 / B:48 O:0 / B:144 0.006549 0.366742 Del
522 449 2026-09-16 M:9 / W:38 816 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 258 P:84 / B:174 O:0 / B:0 0.006549 1.689632 Del
515 442 2026-09-16 M:9 / W:38 545 Shift B P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 BB CC 43 P:0 / B:43 O:0 / B:0 0.041675 1.792034 Del