Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
306 x 2.70 915.00 1830.00 FM E1 UTY E 0 / 85
305 582 2.70 1220.00 2440.00 FA E2 CI D2 0 / 202
304 508 2.70 1220.00 2440.00 FA E2 CI D2 0 / 200
303 592 15.00 1220.00 2440.00 FA B4 CI 17 0 / 35
302 545 15.00 1220.00 2440.00 FA B4 CI 17 0 / 38
301 447 11.60 915.00 1830.00 FA B4 G2 0 / 60
300 516 11.60 915.00 1830.00 FA B4 G2 0 / 60
299 515 11.60 915.00 1830.00 FA B4 G2 0 / 62
298 393 11.60 915.00 1830.00 FA B4 G2 0 / 60
297 520 14.60 915.00 1830.00 MA B4 G1 0 / 31

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
689 701 2026-09-19 M:9 / W:38 X Shift A P1.CU.1 11.60 x 1220.00 x 2440.00 FA B4 G1 10 P:0 / B:10 O:0 / B:10 0.031554 0.315541 Del
688 692 2026-09-19 M:9 / W:38 868 Shift A P1.CU.2 8.60 x 915.00 x 1830.00 MA B4 G1 94 P:0 / B:94 O:94 / B:0 0.012726 1.196227 Del
687 691 2026-09-19 M:9 / W:38 x Shift A P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 38 P:0 / B:38 O:27 / B:11 0.041675 1.583658 Del
686 690 2026-09-19 M:9 / W:38 X Shift A P1.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 47 P:0 / B:47 O:47 / B:0 0.022773 1.070308 Del
685 689 2026-09-19 M:9 / W:38 X Shift A P1.CU.1 8.20 x 1220.00 x 2440.00 FM E1 82 P:4 / B:78 O:78 / B:0 0.021433 1.757503 Del
684 685 2026-09-19 M:9 / W:38 798//852 Shift A P1.CU.2 8.60 x 915.00 x 1830.00 MA B4 G1 80 P:0 / B:80 O:80 / B:0 0.012726 1.018066 Del
683 714 2026-09-19 M:9 / W:38 x//798 Shift A P1.CU.1 8.60 x 915.00 x 1830.00 MA B4 G1 80 P:0 / B:80 O:128 / B:-48 0.012726 1.018066 Del
682 655 2026-09-23 M:9 / W:39 x//917 Shift B P1.CU.3 8.60 x 1220.00 x 2440.00 MA B4 G1 68 P:0 / B:68 O:67 / B:1 0.022624 1.538410 Del
681 684 2026-09-15 M:9 / W:38 529 Shift B P1.CU.2 17.60 x 915.00 x 1830.00 MA B4 G1 34 P:0 / B:34 O:32 / B:2 0.027796 0.945060 Del
680 683 2026-09-18 M:9 / W:38 737 Shift A P1.CU.1 18.00 x 1220.00 x 2440.00 FA E2 BB CC 24 P:0 / B:24 O:24 / B:0 0.050606 1.214534 Del