Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 54 | 314 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 53 | 110 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 199 | |
| 52 | 236 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 198 | |
| 51 | 303 | 2.70 | 1220.00 | 2440.00 | FA E2 D1 D2 | 0 / 139 | |
| 50 | 10 | 6.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 93 | |
| 49 | 170//199 | 11.60 | 1230.00 | 2440.00 | MA B4 G1 | 0 / 60 | |
| 48 | 170 | 11.60 | 1230.00 | 2440.00 | MA B4 G1 | 0 / 60 | |
| 47 | 205 | 8.60 | 1230.00 | 2440.00 | MA B4 G1 | 0 / 55 | |
| 46 | 298 | 14.60 | 1230.00 | 2440.00 | MA B4 G1 | 0 / 50 | |
| 45 | 940 | 8.20 | 1220.00 | 2440.00 | FM E1 BB CC | 0 / 50 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 70 | 49 | 2026-08-29 | M:Agustus / W:35 | 170//199 | Shift B | P1.CU.4 | 11.60 x 1230.00 x 2440.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.031813 | 1.908763 | Del |
| 69 | 48 | 2026-08-29 | M:Agustus / W:35 | 170 | Shift B | P1.CU.7 | 11.60 x 1230.00 x 2440.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.031813 | 1.908763 | Del |
| 68 | 47 | 2026-08-29 | M:Agustus / W:35 | 205 | Shift B | P1.CU.2 | 8.60 x 1230.00 x 2440.00 | MA B4 G1 | 55 | P:0 / B:55 | O:0 / B:55 | 0.022809 | 1.254502 | Del |
| 67 | 46 | 2026-08-29 | M:Agustus / W:35 | 298 | Shift B | P1.CU.4 | 14.60 x 1230.00 x 2440.00 | MA B4 G1 | 50 | P:0 / B:50 | O:0 / B:50 | 0.040816 | 2.040816 | Del |
| 66 | 45 | 2026-08-31 | M:Agustus / W:36 | 940 | Shift A | P1.CU.8 | 8.20 x 1220.00 x 2440.00 | FM E1 BB CC | 50 | P:3 / B:47 | O:47 / B:0 | 0.021433 | 1.071648 | Del |
| 65 | 44 | 2026-08-29 | M:Agustus / W:35 | 199//319 | Shift B | P1.CU.5 | 11.60 x 1230.00 x 2440.00 | MA B4 G1 | 46 | P:0 / B:46 | O:0 / B:46 | 0.031813 | 1.463385 | Del |
| 64 | 43 | 2026-08-29 | M:Agustus / W:35 | 319//323 | Shift B | P1.CU.3 | 11.60 x 1230.00 x 2440.00 | MA B4 G1 | 43 | P:0 / B:43 | O:43 / B:0 | 0.031813 | 1.367947 | Del |