Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
434 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 6
433 x 2.70 1220.00 2440.00 FA E1 UTY 198 / 198
432 x 2.70 1220.00 2440.00 FA E2 D1 D2 0 / 199
431 780 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
429 775 15.00 920.00 2440.00 FA B4 CI 17 38 / 50
428 707 18.00 1220.00 2440.00 FA E2 BB CC 0 / 40
427 708 18.00 1220.00 2440.00 FA E2 BB CC 0 / 34
426 513 2.70 1220.00 2440.00 FA E1 UTY 165 / 200
425 715//714 6.00 1220.00 2440.00 FA B4 BB CC 0 / 65
424 702//701 20.00 1220.00 2440.00 MA B4 G1 0 / 31
Total: 530 data
< Prev Halaman 14 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
526 312 2026-09-16 M:9 / W:38 722 Shift B P2.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 42 P:0 / B:42 O:0 / B:0 0.022773 0.956446 Del
524 451 2026-09-16 M:9 / W:38 662 Shift B P2.CU.2 5.00 x 915.00 x 1830.00 FM E2 LKL C11 7 46 P:0 / B:46 O:0 / B:0 0.006698 0.308099 Del
523 450 2026-09-16 M:9 / W:38 838 Shift B P2.CU.5 2.70 x 1220.00 x 2440.00 FA E1 UTY 56 P:8 / B:48 O:0 / B:144 0.006549 0.366742 Del
522 449 2026-09-16 M:9 / W:38 816 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 258 P:84 / B:174 O:0 / B:0 0.006549 1.689632 Del
515 442 2026-09-16 M:9 / W:38 545 Shift B P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 BB CC 43 P:0 / B:43 O:0 / B:0 0.041675 1.792034 Del
513 441 2026-09-16 M:9 / W:38 x Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 204 P:6 / B:198 O:0 / B:0 0.006549 1.335988 Del
512 440 2026-09-16 M:9 / W:38 579 Shift A P2.CU.1 11.20 x 1220.00 x 2440.00 FM E1 BB CC 27 P:0 / B:27 O:0 / B:18 0.030363 0.819811 Del
510 297 2026-09-15 M:9 / W:38 105 Shift B P2.CU.2 11.20 x 1220.00 x 2440.00 FM E1 BB CC 40 P:2 / B:38 O:0 / B:0 0.030363 1.214534 Del
509 439 2026-09-15 M:9 / W:38 712 Shift B P2.CU.2 18.00 x 1220.00 x 2440.00 FA E2 BB CC 27 P:0 / B:27 O:0 / B:0 0.050606 1.366351 Del
506 437 2026-09-15 M:9 / W:38 592 Shift B P2.CU.2 18.00 x 1220.00 x 2440.00 FA E2 BB CC 35 P:0 / B:35 O:0 / B:0 0.050606 1.771196 Del