Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
388 291 2.70 1220.00 2440.00 FA E2 D1 D2 197 / 197
387 303 2.70 1220.00 2440.00 FA E2 D1 D2 139 / 139
386 492 18.00 1220.00 2440.00 FM E2 CI 17 4 / 31
384 x 2.70 1220.00 2440.00 FA E2 CI D2 0 / 111
383 693//692 5.00 915.00 1830.00 FM E2 LKL C11 7 100 / 100
382 710 5.00 920.00 2440.00 FM E1 UTY E 0 / 100
381 x 11.20 1220.00 2440.00 FM E1 BB CC 0 / 11
380 583 11.20 1220.00 2440.00 FM E1 BB CC 0 / 40
379 747 2.70 1220.00 2440.00 FA E1 UTY 59 / 199
378 447 11.60 915.00 1830.00 FA B4 G2 0 / 60
Total: 536 data
< Prev Halaman 19 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
496 307 2026-09-15 M:9 / W:38 698//688 Shift A P2.CU.2 6.00 x 1220.00 x 2440.00 FA B4 BB CC 98 P:1 / B:97 O:0 / B:0 0.014884 1.458632 Del
495 426 2026-09-15 M:9 / W:38 513 Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 35 P:2 / B:33 O:0 / B:165 0.006549 0.229214 Del
494 422 2026-09-15 M:9 / W:38 602 Shift A P2.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 87 P:5 / B:82 O:0 / B:113 0.006549 0.569760 Del
493 425 2026-09-15 M:9 / W:38 715//714 Shift A P2.CU.1 6.00 x 1220.00 x 2440.00 FA B4 BB CC 65 P:2 / B:63 O:0 / B:0 0.014884 0.967460 Del
492 424 2026-09-15 M:9 / W:38 702//701 Shift A P2.CU.3 20.00 x 1220.00 x 2440.00 MA B4 G1 31 P:8 / B:23 O:0 / B:0 0.056559 1.753335 Del
490 309 2026-09-15 M:9 / W:38 493 Shift A P2.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 53 P:8 / B:45 O:0 / B:147 0.006549 0.347095 Del
487 309 2026-09-15 M:9 / W:38 493 Shift A P2.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 147 P:17 / B:130 O:0 / B:53 0.006549 0.962697 Del
486 420 2026-09-15 M:9 / W:38 536 Shift A P2.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 19 P:2 / B:17 O:0 / B:0 0.058048 1.102904 Del
484 418 2026-09-15 M:9 / W:38 701//347 Shift A P2.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 21 P:4 / B:17 O:0 / B:0 0.058048 1.219000 Del
483 405 2026-09-15 M:9 / W:38 509 Shift A P2.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 176 P:7 / B:169 O:0 / B:24 0.006549 1.152617 Del