Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 124 | 50 | 11.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 60 | |
| 123 | 375 | 11.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 60 | |
| 122 | 230 | 18.00 | 1220.00 | 2440.00 | FM E2 LKL C11 7 | 0 / 19 | |
| 121 | 234 | 18.00 | 1220.00 | 2440.00 | FM E2 LKL C11 7 | 0 / 23 | |
| 120 | 999 | 6.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 100 | |
| 119 | 136 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 | |
| 118 | 111 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 | |
| 117 | 114 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 | |
| 116 | 106 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 | |
| 115 | 107 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 645 | 654 | 2026-09-18 | M:9 / W:38 | 885 | Shift A | P1.CU.4 | 3.00 x 1220.00 x 2440.00 | FA B4 BB CC | 200 | P:0 / B:200 | O:200 / B:0 | 0.007442 | 1.488400 | Del |
| 644 | 650 | 2026-09-18 | M:9 / W:38 | 822 | Shift A | P1.CU.2 | 8.60 x 1220.00 x 2440.00 | MA B4 G1 | 80 | P:4 / B:76 | O:76 / B:0 | 0.022624 | 1.809894 | Del |
| 643 | 663 | 2026-09-18 | M:9 / W:38 | 890//x | Shift A | P1.CU.2 | 8.60 x 1220.00 x 2440.00 | MA B4 G1 | 80 | P:0 / B:80 | O:79 / B:1 | 0.022624 | 1.809894 | Del |
| 642 | 653 | 2026-09-18 | M:9 / W:38 | 864 | Shift A | P1.CU.2 | 3.00 x 1220.00 x 2440.00 | FA B4 BB CC | 200 | P:0 / B:200 | O:200 / B:0 | 0.007442 | 1.488400 | Del |
| 641 | 652 | 2026-09-18 | M:9 / W:38 | 858 | Shift A | P1.CU.2 | 3.00 x 1220.00 x 2440.00 | FA B4 BB CC | 200 | P:0 / B:200 | O:200 / B:0 | 0.007442 | 1.488400 | Del |
| 640 | 651 | 2026-09-18 | M:9 / W:38 | 857 | Shift A | P1.CU.2 | 3.00 x 1220.00 x 2440.00 | FA B4 BB CC | 200 | P:0 / B:200 | O:161 / B:39 | 0.007442 | 1.488400 | Del |
| 639 | 649 | 2026-09-18 | M:9 / W:38 | 823//821 | Shift A | P1.CU.2 | 8.60 x 1220.00 x 2440.00 | MA B4 G1 | 80 | P:8 / B:72 | O:72 / B:0 | 0.022624 | 1.809894 | Del |
| 638 | 567 | 2026-09-16 | M:9 / W:38 | 788 | Shift B | P1.CU.2 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 193 | P:0 / B:193 | O:386 / B:-193 | 0.003181 | 0.614021 | Del |
| 637 | 566 | 2026-09-16 | M:9 / W:38 | 752 | Shift B | P1.CU.3 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 200 | P:0 / B:200 | O:400 / B:-200 | 0.003181 | 0.636291 | Del |
| 636 | 565 | 2026-09-16 | M:9 / W:38 | 745 | Shift B | P1.CU.4 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 200 | P:0 / B:200 | O:400 / B:-200 | 0.003181 | 0.636291 | Del |