Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 224 | x | 3.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 186 | |
| 223 | x | 3.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 198 | |
| 222 | 231 | 3.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 190 | |
| 221 | 477 | 3.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 200 | |
| 220 | 492 | 18.00 | 1220.00 | 2440.00 | FM E2 CI 17 | 0 / 31 | |
| 219 | 968 | 11.60 | 1230.00 | 2440.00 | FA B4 G2 | 0 / 59 | |
| 218 | 967 | 11.60 | 1230.00 | 2440.00 | FA B4 G2 | 0 / 60 | |
| 217 | 67 | 11.60 | 1230.00 | 2440.00 | FA B4 G2 | 0 / 80 | |
| 216 | 347 | 11.60 | 1230.00 | 2440.00 | FA B4 G2 | 0 / 64 | |
| 215 | 354 | 11.60 | 1230.00 | 2440.00 | FA B4 G2 | 0 / 40 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 728 | 728 | 2026-09-21 | M:9 / W:39 | 813 | Shift A | P1.CU.2 | 9.00 x 1220.00 x 2440.00 | FA E2 LKL UTY KRUING | 71 | P:4 / B:67 | O:0 / B:67 | 0.025005 | 1.775364 | Del |
| 727 | 729 | 2026-09-21 | M:9 / W:39 | 909 | Shift A | P1.CU.2 | 15.00 x 1220.00 x 1830.00 | FA B4 CI 17 | 50 | P:1 / B:49 | O:49 / B:0 | 0.031256 | 1.562820 | Del |
| 726 | 724 | 2026-09-21 | M:9 / W:39 | 959 | Shift A | P1.CU.3 | 15.00 x 1220.00 x 2440.00 | FA B4 CI 17 | 47 | P:0 / B:47 | O:47 / B:0 | 0.041675 | 1.958734 | Del |
| 725 | 723 | 2026-09-21 | M:9 / W:39 | 813 | Shift A | P1.CU.3 | 9.00 x 1220.00 x 2440.00 | FA E2 LKL UTY KRUING | 49 | P:0 / B:49 | O:0 / B:49 | 0.025005 | 1.225251 | Del |
| 724 | 718 | 2026-09-21 | M:9 / W:39 | x | Shift A | P1.CU.1 | 8.20 x 1220.00 x 2440.00 | FM E1 | 51 | P:2 / B:49 | O:0 / B:49 | 0.021433 | 1.093081 | Del |
| 723 | 719 | 2026-09-21 | M:9 / W:39 | x | Shift A | P1.CU.1 | 17.20 x 1220.00 x 2440.00 | FM E1 | 7 | P:0 / B:7 | O:0 / B:7 | 0.048224 | 0.337569 | Del |
| 722 | 720 | 2026-09-21 | M:9 / W:39 | x | Shift A | P1.CU.3 | 14.20 x 1220.00 x 2440.00 | FM E1 | 4 | P:0 / B:4 | O:0 / B:4 | 0.039294 | 0.157175 | Del |
| 721 | 721 | 2026-09-21 | M:9 / W:39 | X | Shift A | P1.CU.1 | 11.20 x 1220.00 x 2440.00 | FM E1 | 9 | P:0 / B:9 | O:9 / B:0 | 0.030363 | 0.273270 | Del |
| 717 | 727 | 2026-09-21 | M:9 / W:39 | 856 | Shift A | P1.CU.2 | 3.00 x 1220.00 x 2440.00 | FA B4 BB CC | 200 | P:1 / B:199 | O:199 / B:0 | 0.007442 | 1.488400 | Del |
| 716 | 726 | 2026-09-21 | M:9 / W:39 | 859 | Shift A | P1.CU.4 | 3.00 x 1220.00 x 2440.00 | FA B4 BB CC | 201 | P:0 / B:201 | O:201 / B:0 | 0.007442 | 1.495842 | Del |