Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 64 | 279 | 15.00 | 1220.00 | 2440.00 | FA B4 CI 17 | 0 / 50 | |
| 63 | 8382 | 3.70 | 1230.00 | 2440.00 | FM B4 G1 | 0 / 200 | |
| 62 | 294 | 2.70 | 1220.00 | 2440.00 | FA E2 D1 D2 | 0 / 200 | |
| 61 | x | 2.70 | 1220.00 | 2440.00 | FA E2 D1 D2 | 0 / 200 | |
| 60 | 291 | 2.70 | 1220.00 | 2440.00 | FA E2 D1 D2 | 0 / 200 | |
| 59 | 292 | 2.70 | 1220.00 | 2440.00 | FA E2 D1 D2 | 200 / 200 | |
| 58 | 8384 | 3.70 | 1230.00 | 2440.00 | FM B4 G1 | 0 / 200 | |
| 57 | 8383 | 3.70 | 1230.00 | 2440.00 | FM B4 G1 | 0 / 200 | |
| 56 | 316 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 55 | 315 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 776 | 776 | 2026-09-20 | M:9 / W:38 | x | Shift A | P1.CU.1 | 14.60 x 920.00 x 1830.00 | MA B4 G1 | 42 | P:0 / B:42 | O:42 / B:0 | 0.022897 | 0.961672 | Del |
| 775 | 775 | 2026-09-21 | M:9 / W:39 | 944 | Shift A | P1.CU.2 | 11.60 x 1220.00 x 2440.00 | MA B4 G1 | 60 | P:0 / B:60 | O:60 / B:0 | 0.031554 | 1.893245 | Del |
| 774 | 742 | 2026-09-19 | M:9 / W:38 | X | Shift A | P1.CU.2 | 15.00 x 1220.00 x 2440.00 | FA B4 G1 | 38 | P:0 / B:38 | O:38 / B:0 | 0.041675 | 1.583658 | Del |
| 770 | 767 | 2026-09-16 | M:9 / W:38 | 742 | Shift A | P1.CU.1 | 5.00 x 915.00 x 1830.00 | FM E2 UTY B(1xP) | 86 | P:0 / B:86 | O:86 / B:0 | 0.006698 | 0.576011 | Del |
| 769 | 766 | 2026-09-17 | M:9 / W:38 | 743 | Shift A | P1.CU.2 | 5.00 x 915.00 x 1830.00 | FM E2 UTY B(1xP) | 100 | P:0 / B:100 | O:100 / B:0 | 0.006698 | 0.669780 | Del |
| 765 | 763 | 2026-09-16 | M:9 / W:38 | 729 | Shift A | P1.CU.1 | 5.00 x 915.00 x 1830.00 | FM E2 UTY B(1xP) | 113 | P:0 / B:113 | O:113 / B:0 | 0.006698 | 0.756851 | Del |
| 763 | 542 | 2026-09-15 | M:9 / W:38 | 581 | Shift A | P1.CU.2 | 2.70 x 1220.00 x 2440.00 | FA E1 UTY | 200 | P:0 / B:200 | O:200 / B:0 | 0.006549 | 1.309792 | Del |
| 762 | 544 | 2026-09-16 | M:9 / W:38 | 496 | Shift A | P1.CU.2 | 2.70 x 1220.00 x 2440.00 | FA E1 UTY | 226 | P:0 / B:226 | O:226 / B:0 | 0.006549 | 1.480065 | Del |
| 761 | 540 | 2026-09-16 | M:9 / W:38 | 838 | Shift B | P1.CU.4 | 2.70 x 1220.00 x 2440.00 | FA E1 UTY | 200 | P:0 / B:200 | O:200 / B:0 | 0.006549 | 1.309792 | Del |
| 760 | 761 | 2026-09-10 | M:9 / W:37 | 689 | Shift B | P1.CU.1 | 2.70 x 920.00 x 1830.00 | FA E1 UTY E | 204 | P:0 / B:204 | O:0 / B:204 | 0.003704 | 0.755600 | Del |