Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data GS P1

Daftar referensi data GS P1

No GS P1 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
1131 x 6.00 1220.00 2440.00 FA B4 BB CC 73 (Sisa: 0)
1130 825 6.00 1220.00 2440.00 FA B4 BB CC 102 (Sisa: 0)
1129 x 18.00 1220.00 2440.00 FA E2 BB CC 24 (Sisa: 0)
1128 708 18.00 1220.00 2440.00 FA E2 BB CC 36 (Sisa: 0)
1127 x 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
1126 411 2.70 920.00 2440.00 FA E1 UTY 190 (Sisa: 0)
1125 493 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
1124 509 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
1123 513 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
1122 707 18.00 1220.00 2440.00 FA E2 BB CC 40 (Sisa: 0)
Hal 19/63 (Total: 629)

Form Input Data Dempul P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi GS_P1
2. Input Data Dempul_P1

Daftar Hasil Input Data Dempul P1

Rekapitulasi data yang telah berhasil disimpan

ID ID GS P1 Tanggal Bulan Minggu No Pallet Shift No Meja Jumlah Dempul Tebal M³/PCS TOT P1 M³ Aksi
197 793 2026-09-03 September 36 428 Shift A P1.DMP.10 164 2.70 0.003684 0.604142 Delete
196 792 2026-09-03 September 36 481 Shift A P1.DMP.6 200 2.70 0.003684 0.736758 Delete
195 791 2026-09-03 September 36 470//480 Shift A P1.DMP.8 196 2.70 0.003684 0.722023 Delete
194 790 2026-09-03 September 36 370//470 Shift A P1.DMP.9 190 2.70 0.003684 0.699920 Delete
193 783 2026-09-03 September 36 453/x Shift B P1.DMP.7 60 11.60 0.031813 1.908763 Delete
192 782 2026-09-03 September 36 454//453 Shift B P1.DMP.9 60 11.60 0.031813 1.908763 Delete
191 781 2026-09-03 September 36 454 Shift A P1.DMP.1 60 11.60 0.031813 1.908763 Delete
190 778 2026-09-03 September 36 457 Shift B P1.DMP.9 53 11.60 0.031813 1.686074 Delete
189 775 2026-09-03 September 36 482 Shift B P1.DMP.9 200 2.40 0.003181 0.636291 Delete
188 774 2026-09-03 September 36 433 Shift B P1.DMP.10 200 2.40 0.003181 0.636291 Delete
Menampilkan Halaman 57 dari 72 (Total: 717 data)