Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data GS P1

Daftar referensi data GS P1

No GS P1 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
1129 x 18.00 1220.00 2440.00 FA E2 BB CC 24 (Sisa: 0)
1128 708 18.00 1220.00 2440.00 FA E2 BB CC 36 (Sisa: 0)
1127 x 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
1126 411 2.70 920.00 2440.00 FA E1 UTY 190 (Sisa: 0)
1125 493 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
1124 509 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
1123 513 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
1122 707 18.00 1220.00 2440.00 FA E2 BB CC 40 (Sisa: 0)
1121 670 11.60 915.00 1830.00 FA B4 CI 17 G2 60 (Sisa: 0)
1120 777 15.00 1220.00 2440.00 FA B4 CI 17 44 (Sisa: 0)
Hal 23/73 (Total: 729)

Form Input Data Dempul P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi GS_P1
2. Input Data Dempul_P1

Daftar Hasil Input Data Dempul P1

Rekapitulasi data yang telah berhasil disimpan

ID ID GS P1 Tanggal Bulan Minggu No Pallet Shift No Meja Jumlah Dempul Tebal M³/PCS TOT P1 M³ Aksi
168 758 2026-09-02 September 36 x Shift B P1.DMP.10 18 8.20 0.021433 0.385793 Delete
167 757 2026-09-02 September 36 x Shift B P1.DMP.9 55 8.20 0.021433 1.178813 Delete
166 755 2026-09-02 September 36 46 Shift B P1.DMP.10 65 8.20 0.021433 1.393142 Delete
165 754 2026-09-02 September 36 811 Shift B P1.DMP.4 44 9.00 0.025005 1.100225 Delete
164 753 2026-09-02 September 36 330 Shift B P1.DMP.3 80 9.00 0.023814 1.905152 Delete
163 752 2026-09-02 September 36 331 Shift A P1.DMP.9 80 9.00 0.023814 1.905152 Delete
162 751 2026-09-02 September 36 367 Shift A P1.DMP.8 200 2.70 0.003684 0.736758 Delete
161 750 2026-09-02 September 36 369 Shift A P1.DMP.8 180 2.70 0.003684 0.663082 Delete
160 749 2026-09-02 September 36 366 Shift A P1.DMP.9 200 2.70 0.003684 0.736758 Delete
159 748 2026-09-02 September 36 351 Shift A P1.DMP.9 214 2.70 0.003684 0.788331 Delete
Menampilkan Halaman 61 dari 73 (Total: 728 data)