Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
602 853 11.60 915.00 1830.00 MA B4 G1 60 / 60
601 854 11.60 915.00 1830.00 MA B4 G1 60 / 60
599 864 3.00 1220.00 2440.00 FA B4 BB CC 178 / 200
598 x//798 8.60 915.00 1830.00 MA B4 G1 0 / 32
597 x//798 8.60 915.00 1830.00 MA B4 G1 0 / 48
596 798//852 8.60 915.00 1830.00 MA B4 G1 80 / 80
595 906 14.60 915.00 1830.00 MA B4 G1 50 / 50
593 906//878 14.60 915.00 1830.00 MA B4 G1 0 / 36
592 913 14.60 915.00 1830.00 MA B4 G1 39 / 39
591 x 6.00 1220.00 2440.00 FA B4 BB CC 0 / 51
Total: 544 data
< Prev Halaman 1 dari 55 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
539 461 2026-09-16 M:9 / W:38 581 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:7 / B:193 O:0 / B:0 0.006549 1.309792 Del
538 450 2026-09-16 M:9 / W:38 838 Shift B P2.CU.4 2.70 x 1220.00 x 2440.00 FA E1 UTY 144 P:2 / B:142 O:0 / B:56 0.006549 0.943050 Del
537 460 2026-09-16 M:9 / W:38 842 Shift B P2.CU.4 18.00 x 1220.00 x 2440.00 FA E1 UTY 21 P:0 / B:21 O:0 / B:0 0.050606 1.062718 Del
536 457 2026-09-16 M:9 / W:38 774//786 Shift B P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 32 P:0 / B:32 O:0 / B:16 0.041675 1.333606 Del
535 459 2026-09-16 M:9 / W:38 x Shift B P2.CU.4 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:48 / B:152 O:0 / B:0 0.006549 1.309792 Del
534 458 2026-09-16 M:9 / W:38 774//786 Shift B P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 48 P:0 / B:48 O:0 / B:0 0.041675 2.000410 Del
533 447 2026-09-16 M:9 / W:38 799 Shift B P2.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 44 P:1 / B:43 O:0 / B:6 0.041675 1.833709 Del
532 456 2026-09-16 M:9 / W:38 496 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 226 P:49 / B:177 O:0 / B:0 0.006549 1.480065 Del
531 314 2026-09-16 M:9 / W:38 634//725 Shift B P2.CU.3 14.60 x 915.00 x 1830.00 MA B4 G1 21 P:0 / B:21 O:0 / B:0 0.022773 0.478223 Del
530 310 2026-09-16 M:9 / W:38 634 Shift B P2.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 27 P:1 / B:26 O:0 / B:15 0.022773 0.614858 Del