Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
602 853 11.60 915.00 1830.00 MA B4 G1 60 / 60
601 854 11.60 915.00 1830.00 MA B4 G1 60 / 60
599 864 3.00 1220.00 2440.00 FA B4 BB CC 178 / 200
598 x//798 8.60 915.00 1830.00 MA B4 G1 0 / 32
597 x//798 8.60 915.00 1830.00 MA B4 G1 0 / 48
596 798//852 8.60 915.00 1830.00 MA B4 G1 80 / 80
595 906 14.60 915.00 1830.00 MA B4 G1 50 / 50
593 906//878 14.60 915.00 1830.00 MA B4 G1 0 / 36
592 913 14.60 915.00 1830.00 MA B4 G1 39 / 39
591 x 6.00 1220.00 2440.00 FA B4 BB CC 0 / 51
Total: 544 data
< Prev Halaman 1 dari 55 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
515 442 2026-09-16 M:9 / W:38 545 Shift B P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 BB CC 43 P:0 / B:43 O:0 / B:0 0.041675 1.792034 Del
514 315 2026-09-16 M:9 / W:38 571 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:21 / B:179 O:0 / B:0 0.006549 1.309792 Del
513 441 2026-09-16 M:9 / W:38 x Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 204 P:6 / B:198 O:0 / B:0 0.006549 1.335988 Del
512 440 2026-09-16 M:9 / W:38 579 Shift A P2.CU.1 11.20 x 1220.00 x 2440.00 FM E1 BB CC 27 P:0 / B:27 O:0 / B:18 0.030363 0.819811 Del
511 440 2026-09-15 M:9 / W:38 579 Shift B P2.CU.4 11.20 x 1220.00 x 2440.00 FM E1 BB CC 18 P:0 / B:18 O:0 / B:27 0.030363 0.546540 Del
510 297 2026-09-15 M:9 / W:38 105 Shift B P2.CU.2 11.20 x 1220.00 x 2440.00 FM E1 BB CC 40 P:2 / B:38 O:0 / B:0 0.030363 1.214534 Del
509 439 2026-09-15 M:9 / W:38 712 Shift B P2.CU.2 18.00 x 1220.00 x 2440.00 FA E2 BB CC 27 P:0 / B:27 O:0 / B:0 0.050606 1.366351 Del
508 438 2026-09-15 M:9 / W:38 x Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 143 P:6 / B:137 O:0 / B:57 0.006549 0.936501 Del
507 438 2026-09-15 M:9 / W:38 x Shift B P2.CU.3 2.70 x 1220.00 x 2440.00 FA E1 UTY 57 P:15 / B:42 O:0 / B:143 0.006549 0.373291 Del
506 437 2026-09-15 M:9 / W:38 592 Shift B P2.CU.2 18.00 x 1220.00 x 2440.00 FA E2 BB CC 35 P:0 / B:35 O:0 / B:0 0.050606 1.771196 Del