Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
602 853 11.60 915.00 1830.00 MA B4 G1 60 / 60
601 854 11.60 915.00 1830.00 MA B4 G1 60 / 60
599 864 3.00 1220.00 2440.00 FA B4 BB CC 178 / 200
598 x//798 8.60 915.00 1830.00 MA B4 G1 0 / 32
597 x//798 8.60 915.00 1830.00 MA B4 G1 0 / 48
596 798//852 8.60 915.00 1830.00 MA B4 G1 80 / 80
595 906 14.60 915.00 1830.00 MA B4 G1 50 / 50
593 906//878 14.60 915.00 1830.00 MA B4 G1 0 / 36
592 913 14.60 915.00 1830.00 MA B4 G1 39 / 39
591 x 6.00 1220.00 2440.00 FA B4 BB CC 0 / 51
Total: 544 data
< Prev Halaman 1 dari 55 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
496 307 2026-09-15 M:9 / W:38 698//688 Shift A P2.CU.2 6.00 x 1220.00 x 2440.00 FA B4 BB CC 98 P:1 / B:97 O:0 / B:0 0.014884 1.458632 Del
495 426 2026-09-15 M:9 / W:38 513 Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 35 P:2 / B:33 O:0 / B:165 0.006549 0.229214 Del
494 422 2026-09-15 M:9 / W:38 602 Shift A P2.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 87 P:5 / B:82 O:0 / B:113 0.006549 0.569760 Del
493 425 2026-09-15 M:9 / W:38 715//714 Shift A P2.CU.1 6.00 x 1220.00 x 2440.00 FA B4 BB CC 65 P:2 / B:63 O:0 / B:0 0.014884 0.967460 Del
492 424 2026-09-15 M:9 / W:38 702//701 Shift A P2.CU.3 20.00 x 1220.00 x 2440.00 MA B4 G1 31 P:8 / B:23 O:0 / B:0 0.056559 1.753335 Del
491 423 2026-09-15 M:9 / W:38 411 Shift A P2.CU.3 2.70 x 920.00 x 2440.00 FA E1 UTY 190 P:55 / B:135 O:0 / B:0 0.004939 0.938326 Del
490 309 2026-09-15 M:9 / W:38 493 Shift A P2.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 53 P:8 / B:45 O:0 / B:147 0.006549 0.347095 Del
489 422 2026-09-15 M:9 / W:38 602 Shift A P2.CU.3 2.70 x 1220.00 x 2440.00 FA E1 UTY 113 P:1 / B:112 O:0 / B:87 0.006549 0.740032 Del
488 421 2026-09-15 M:9 / W:38 682//697 Shift B P2.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 22 P:2 / B:20 O:0 / B:0 0.058048 1.277047 Del
487 309 2026-09-15 M:9 / W:38 493 Shift A P2.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 147 P:17 / B:130 O:0 / B:53 0.006549 0.962697 Del