Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
423 411 2.70 920.00 2440.00 FA E1 UTY 190 / 190
422 602 2.70 1220.00 2440.00 FA E1 UTY 113 / 200
421 682//697 20.50 1220.00 2440.00 MA B4 G1 22 / 22
420 536 20.50 1220.00 2440.00 MA B4 G1 0 / 19
419 536 20.50 1220.00 2440.00 MA B4 G1 21 / 21
418 701//347 20.50 1220.00 2440.00 MA B4 G1 0 / 21
417 713 6.00 1220.00 2440.00 FA B4 BB CC 59 / 59
416 637 18.00 1220.00 2440.00 FA B4 BB CC 36 / 36
415 612 11.60 915.00 1830.00 FA B4 G2 50 / 50
414 638 18.00 1220.00 2440.00 FA B4 BB CC 0 / 34
Total: 530 data
< Prev Halaman 15 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
493 425 2026-09-15 M:9 / W:38 715//714 Shift A P2.CU.1 6.00 x 1220.00 x 2440.00 FA B4 BB CC 65 P:2 / B:63 O:0 / B:0 0.014884 0.967460 Del
492 424 2026-09-15 M:9 / W:38 702//701 Shift A P2.CU.3 20.00 x 1220.00 x 2440.00 MA B4 G1 31 P:8 / B:23 O:0 / B:0 0.056559 1.753335 Del
490 309 2026-09-15 M:9 / W:38 493 Shift A P2.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 53 P:8 / B:45 O:0 / B:147 0.006549 0.347095 Del
487 309 2026-09-15 M:9 / W:38 493 Shift A P2.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 147 P:17 / B:130 O:0 / B:53 0.006549 0.962697 Del
486 420 2026-09-15 M:9 / W:38 536 Shift A P2.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 19 P:2 / B:17 O:0 / B:0 0.058048 1.102904 Del
484 418 2026-09-15 M:9 / W:38 701//347 Shift A P2.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 21 P:4 / B:17 O:0 / B:0 0.058048 1.219000 Del
483 405 2026-09-15 M:9 / W:38 509 Shift A P2.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 176 P:7 / B:169 O:0 / B:24 0.006549 1.152617 Del
477 299 2026-09-14 M:9 / W:38 617 Shift A P2.CU.2 11.60 x 915.00 x 1830.00 FA B4 G2 20 P:0 / B:20 O:0 / B:34 0.017749 0.354983 Del
476 414 2026-09-14 M:9 / W:38 638 Shift A P2.CU.1 18.00 x 1220.00 x 2440.00 FA B4 BB CC 34 P:1 / B:33 O:0 / B:0 0.050606 1.720590 Del
475 413 2026-09-14 M:9 / W:38 588 Shift A P2.CU.3 18.00 x 1220.00 x 2440.00 FA B4 BB CC 35 P:0 / B:35 O:0 / B:0 0.050606 1.771196 Del