Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
472 752 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
471 790 2.40 915.00 1830.00 FM E1 UTY E 200 / 200
470 870 11.60 915.00 1830.00 FA B4 G2 36 / 36
468 833 11.60 915.00 1830.00 FA B4 G2 60 / 60
467 745 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
466 698 6.00 1220.00 2440.00 FA B4 BB CC 0 / 50
465 784 2.40 915.00 1830.00 FM E1 UTY E 0 / 199
463 748 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
462 490 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
461 581 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
Total: 536 data
< Prev Halaman 11 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
391 229 2026-09-11 M:9 / W:37 593 Shift A P2.CU.4 15.00 x 1220.00 x 2440.00 FA B4 CI 17 6 P:0 / B:6 O:0 / B:43 0.041675 0.250051 Del
389 246 2026-09-12 M:9 / W:37 580//538 Shift A P2.CU.2 17.60 x 1220.00 x 2440.00 MA B4 G1 39 P:11 / B:28 O:0 / B:0 0.049415 1.927180 Del
388 245 2026-09-12 M:9 / W:37 574 Shift A P2.CU.2 17.60 x 920.00 x 2440.00 MA B4 G1 40 P:5 / B:35 O:0 / B:0 0.037264 1.490547 Del
387 395 2026-09-12 M:9 / W:37 666 Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 28 P:4 / B:24 O:0 / B:170 0.006549 0.183371 Del
386 263 2026-09-12 M:9 / W:37 484 Shift A P2.CU.4 9.00 x 1220.00 x 2440.00 FA E2 LKL UTY KRUING 80 P:7 / B:73 O:0 / B:0 0.025005 2.000410 Del
384 394 2026-09-12 M:9 / W:37 664 Shift A P2.CU.4 11.60 x 1220.00 x 2440.00 MA B4 G1 63 P:8 / B:55 O:0 / B:0 0.031554 1.987907 Del
382 392 2026-09-12 M:9 / W:37 646 Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 172 P:17 / B:155 O:0 / B:15 0.006549 1.126421 Del
381 306 2026-09-12 M:9 / W:37 749 Shift A P2.CU.3 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:32 / B:168 O:0 / B:0 0.006549 1.309792 Del
380 270 2026-09-10 M:9 / W:37 565//555 Shift A P2.CU.2 14.60 x 1220.00 x 2440.00 MA B4 G1 22 P:0 / B:22 O:0 / B:0 0.040484 0.890659 Del
379 269 2026-09-10 M:9 / W:37 677//565 Shift A P2.CU.1 14.60 x 1220.00 x 2440.00 MA B4 G1 12 P:11 / B:1 O:0 / B:0 0.040484 0.485814 Del