Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
460 842 18.00 1220.00 2440.00 FA E1 UTY 0 / 21
459 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
458 774//786 15.00 1220.00 2440.00 FA B4 CI 17 48 / 48
457 774//786 15.00 1220.00 2440.00 FA B4 CI 17 48 / 48
456 496 2.70 1220.00 2440.00 FA E1 UTY 0 / 226
455 734 14.60 915.00 1830.00 MA B4 G1 37 / 37
454 766 14.60 915.00 1830.00 MA B4 G1 0 / 34
453 725//722 14.60 915.00 1830.00 MA B4 G1 42 / 42
452 243 5.00 915.00 1830.00 FM E2 CI 17 53 / 53
451 662 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 46
Total: 536 data
< Prev Halaman 12 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
391 229 2026-09-11 M:9 / W:37 593 Shift A P2.CU.4 15.00 x 1220.00 x 2440.00 FA B4 CI 17 6 P:0 / B:6 O:0 / B:43 0.041675 0.250051 Del
389 246 2026-09-12 M:9 / W:37 580//538 Shift A P2.CU.2 17.60 x 1220.00 x 2440.00 MA B4 G1 39 P:11 / B:28 O:0 / B:0 0.049415 1.927180 Del
388 245 2026-09-12 M:9 / W:37 574 Shift A P2.CU.2 17.60 x 920.00 x 2440.00 MA B4 G1 40 P:5 / B:35 O:0 / B:0 0.037264 1.490547 Del
387 395 2026-09-12 M:9 / W:37 666 Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 28 P:4 / B:24 O:0 / B:170 0.006549 0.183371 Del
386 263 2026-09-12 M:9 / W:37 484 Shift A P2.CU.4 9.00 x 1220.00 x 2440.00 FA E2 LKL UTY KRUING 80 P:7 / B:73 O:0 / B:0 0.025005 2.000410 Del
385 303 2026-09-12 M:9 / W:37 665 Shift A P2.CU.1 11.60 x 1220.00 x 2440.00 MA B4 G1 42 P:11 / B:31 O:0 / B:0 0.031554 1.325271 Del
384 394 2026-09-12 M:9 / W:37 664 Shift A P2.CU.4 11.60 x 1220.00 x 2440.00 MA B4 G1 63 P:8 / B:55 O:0 / B:0 0.031554 1.987907 Del
382 392 2026-09-12 M:9 / W:37 646 Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 172 P:17 / B:155 O:0 / B:15 0.006549 1.126421 Del
381 306 2026-09-12 M:9 / W:37 749 Shift A P2.CU.3 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:32 / B:168 O:0 / B:0 0.006549 1.309792 Del
380 270 2026-09-10 M:9 / W:37 565//555 Shift A P2.CU.2 14.60 x 1220.00 x 2440.00 MA B4 G1 22 P:0 / B:22 O:0 / B:0 0.040484 0.890659 Del