Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 164 | 46 | 8.20 | 1220.00 | 2440.00 | FM E1 BB CC | 0 / 65 | |
| 163 | 811 | 9.00 | 1220.00 | 2440.00 | FA E2 UTY KRUING | 0 / 44 | |
| 162 | 330 | 9.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 80 | |
| 161 | 331 | 9.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 80 | |
| 160 | 367 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 159 | 369 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 180 | |
| 158 | 366 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 157 | 351 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 214 | |
| 156 | 336 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 155 | 346 | 20.50 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 31 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 573 | 572 | 2026-09-01 | M:9 / W:36 | 123 | Shift A | P1.CU.2 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 184 | P:0 / B:184 | O:184 / B:0 | 0.003181 | 0.585388 | Del |
| 572 | 571 | 2026-09-01 | M:9 / W:36 | 123 | Shift A | P1.CU.2 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 16 | P:6 / B:10 | O:0 / B:10 | 0.003181 | 0.050903 | Del |
| 571 | 603 | 2026-09-16 | M:9 / W:38 | 468 | Shift A | P1.CU.1 | 18.00 x 1220.00 x 2440.00 | FA E1 UTY | 23 | P:0 / B:23 | O:0 / B:23 | 0.050606 | 1.163929 | Del |
| 570 | 602 | 2026-09-16 | M:9 / W:38 | 243 | Shift A | P1.CU.3 | 5.00 x 915.00 x 1830.00 | FM E2 CI 17 | 53 | P:0 / B:53 | O:53 / B:0 | 0.006698 | 0.354983 | Del |
| 569 | 601 | 2026-09-16 | M:9 / W:38 | 662 | Shift B | P1.CU.1 | 5.00 x 915.00 x 1830.00 | FM E2 LKL C11 7 | 46 | P:0 / B:46 | O:46 / B:0 | 0.006698 | 0.308099 | Del |
| 568 | 600 | 2026-09-12 | M:9 / W:37 | 710 | Shift A | P1.CU.2 | 5.00 x 920.00 x 2440.00 | FM E1 UTY E | 100 | P:0 / B:100 | O:100 / B:0 | 0.008979 | 0.897920 | Del |
| 567 | 599 | 2026-09-12 | M:9 / W:37 | 642 | Shift A | P1.CU.2 | 11.00 x 1220.00 x 2440.00 | FM PENOL MAHONI | 2 | P:0 / B:2 | O:0 / B:2 | 0.029768 | 0.059536 | Del |
| 566 | 598 | 2026-09-10 | M:9 / W:37 | 693//692 | Shift A | P1.CU.3 | 5.00 x 915.00 x 1830.00 | FM E2 LKL C11 7 | 100 | P:0 / B:100 | O:100 / B:0 | 0.006698 | 0.669780 | Del |
| 565 | 597 | 2026-09-10 | M:9 / W:37 | 642 | Shift A | P1.CU.1 | 11.00 x 1220.00 x 2440.00 | FM E1 UTY E | 2 | P:0 / B:2 | O:0 / B:2 | 0.029768 | 0.059536 | Del |
| 564 | 596 | 2026-09-10 | M:9 / W:37 | 497 | Shift A | P1.CU.1 | 3.00 x 1220.00 x 2440.00 | FM E1 UTY E | 4 | P:0 / B:4 | O:0 / B:4 | 0.007442 | 0.029768 | Del |