Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 164 | 46 | 8.20 | 1220.00 | 2440.00 | FM E1 BB CC | 0 / 65 | |
| 163 | 811 | 9.00 | 1220.00 | 2440.00 | FA E2 UTY KRUING | 0 / 44 | |
| 162 | 330 | 9.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 80 | |
| 161 | 331 | 9.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 80 | |
| 160 | 367 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 159 | 369 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 180 | |
| 158 | 366 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 157 | 351 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 214 | |
| 156 | 336 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 155 | 346 | 20.50 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 31 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 563 | 595 | 2026-09-09 | M:9 / W:37 | 664 | Shift B | P1.CU.2 | 11.60 x 1220.00 x 2440.00 | MA B4 G1 | 63 | P:0 / B:63 | O:63 / B:0 | 0.031554 | 1.987907 | Del |
| 562 | 594 | 2026-09-09 | M:9 / W:37 | 63 | Shift A | P1.CU.2 | 15.00 x 1220.00 x 2440.00 | FA B4 BB CC | 50 | P:0 / B:50 | O:0 / B:50 | 0.041675 | 2.083760 | Del |
| 561 | 593 | 2026-09-09 | M:9 / W:37 | 597 | Shift A | P1.CU.5 | 5.00 x 915.00 x 1830.00 | FM E2 LKL C11 7 | 108 | P:0 / B:108 | O:108 / B:0 | 0.006698 | 0.723362 | Del |
| 560 | 592 | 2026-09-05 | M:9 / W:36 | 471//476 | Shift A | P1.CU.7 | 15.00 x 1220.00 x 2440.00 | FA B4 CI 17 | 50 | P:0 / B:50 | O:50 / B:0 | 0.041675 | 2.083760 | Del |
| 559 | 591 | 2026-09-05 | M:9 / W:36 | 130 | Shift A | P1.CU.4 | 5.00 x 915.00 x 1830.00 | FM E2 LKL C11 7 | 95 | P:0 / B:95 | O:95 / B:0 | 0.006698 | 0.636291 | Del |
| 558 | 590 | 2026-09-05 | M:9 / W:36 | 120 | Shift A | P1.CU.5 | 5.00 x 915.00 x 1830.00 | FM E2 LKL C11 7 | 101 | P:0 / B:101 | O:101 / B:0 | 0.006698 | 0.676478 | Del |
| 557 | 589 | 2026-09-05 | M:9 / W:36 | 95 | Shift A | P1.CU.4 | 5.00 x 915.00 x 1830.00 | FA E2 UTY KRUING | 101 | P:0 / B:101 | O:101 / B:0 | 0.007368 | 0.744126 | Del |
| 556 | 588 | 2026-09-05 | M:9 / W:36 | 94 | Shift A | P1.CU.4 | 5.00 x 915.00 x 1830.00 | FM E2 LKL C11 7 | 101 | P:0 / B:101 | O:101 / B:0 | 0.006698 | 0.676478 | Del |
| 555 | 587 | 2026-09-05 | M:9 / W:36 | 63 | Shift A | P1.CU.5 | 5.00 x 1220.00 x 2440.00 | FM E2 LKL C11 7 | 96 | P:0 / B:96 | O:0 / B:96 | 0.011907 | 1.143091 | Del |
| 554 | 586 | 2026-09-05 | M:9 / W:36 | 55 | Shift A | P1.CU.3 | 5.00 x 910.00 x 1830.00 | FM E2 LKL C11 7 | 96 | P:0 / B:96 | O:96 / B:0 | 0.006661 | 0.639475 | Del |