Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 144 | 328 | 17.60 | 1230.00 | 2440.00 | MA B4 G1 | 0 / 40 | |
| 143 | 230 | 18.00 | 1220.00 | 2440.00 | FM E2 LKL C11 7 | 0 / 30 | |
| 142 | 385 | 3.70 | 1230.00 | 2440.00 | FM B4 G1 | 0 / 200 | |
| 141 | 254 | 3.70 | 1230.00 | 2440.00 | FM B4 G1 | 0 / 200 | |
| 140 | 147 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 139 | 181 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 138 | 8308 | 3.70 | 1230.00 | 2440.00 | FM B4 G1 | 0 / 200 | |
| 137 | 374 | 14.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 37 | |
| 136 | 403 | 11.60 | 915.00 | 1830.00 | FA B4 G2 | 0 / 60 | |
| 135 | 402 | 11.60 | 915.00 | 1830.00 | FA B4 G2 | 0 / 60 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 509 | 499 | 2026-09-15 | M:September / W:38 | x | Shift A | P1.CU.2 | 9.00 x 1220.00 x 2440.00 | FA E1 UTY | 28 | P:0 / B:28 | O:27 / B:1 | 0.023814 | 0.666803 | Del |
| 508 | 498 | 2026-09-15 | M:September / W:38 | 813 | Shift A | P1.CU.1 | 9.00 x 1220.00 x 2440.00 | FA E1 UTY | 80 | P:0 / B:80 | O:0 / B:80 | 0.023814 | 1.905152 | Del |
| 507 | 497 | 2026-09-15 | M:September / W:38 | 794 | Shift A | P1.CU.2 | 11.60 x 915.00 x 1830.00 | FA B4 G2 | 30 | P:0 / B:30 | O:30 / B:0 | 0.017749 | 0.532475 | Del |
| 506 | 496 | 2026-09-15 | M:September / W:38 | 802 | Shift A | P1.CU.2 | 11.60 x 915.00 x 1830.00 | FA B4 G2 | 50 | P:1 / B:49 | O:48 / B:1 | 0.017749 | 0.887459 | Del |
| 505 | 495 | 2026-09-15 | M:September / W:38 | 792 | Shift A | P1.CU.1 | 11.60 x 915.00 x 2440.00 | FA B4 G2 | 40 | P:0 / B:40 | O:40 / B:0 | 0.023666 | 0.946622 | Del |
| 504 | 494 | 2026-09-14 | M:September / W:38 | x | Shift A | P1.CU.1 | 2.70 x 1220.00 x 2440.00 | FA E1 UTY | 188 | P:0 / B:188 | O:0 / B:188 | 0.006549 | 1.231204 | Del |
| 503 | 493 | 2026-09-14 | M:September / W:38 | x | Shift B | P1.CU.1 | 18.00 x 1220.00 x 2440.00 | FA E2 BB CC | 24 | P:2 / B:22 | O:0 / B:22 | 0.050606 | 1.214534 | Del |
| 502 | 492 | 2026-09-15 | M:September / W:38 | 708 | Shift A | P1.CU.1 | 18.00 x 1220.00 x 2440.00 | FA E2 BB CC | 36 | P:2 / B:34 | O:0 / B:34 | 0.050606 | 1.821802 | Del |
| 501 | 491 | 2026-09-14 | M:September / W:38 | x | Shift B | P1.CU.1 | 2.70 x 1220.00 x 2440.00 | FA E1 UTY | 200 | P:0 / B:200 | O:0 / B:200 | 0.006549 | 1.309792 | Del |
| 500 | 490 | 2026-09-14 | M:September / W:38 | 411 | Shift A | P1.CU.1 | 2.70 x 920.00 x 2440.00 | FA E1 UTY | 190 | P:0 / B:190 | O:0 / B:190 | 0.004939 | 0.938326 | Del |