Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
144 328 17.60 1230.00 2440.00 MA B4 G1 0 / 40
143 230 18.00 1220.00 2440.00 FM E2 LKL C11 7 0 / 30
142 385 3.70 1230.00 2440.00 FM B4 G1 0 / 200
141 254 3.70 1230.00 2440.00 FM B4 G1 0 / 200
140 147 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
139 181 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
138 8308 3.70 1230.00 2440.00 FM B4 G1 0 / 200
137 374 14.60 915.00 1830.00 MA B4 G1 0 / 37
136 403 11.60 915.00 1830.00 FA B4 G2 0 / 60
135 402 11.60 915.00 1830.00 FA B4 G2 0 / 60

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
499 489 2026-09-14 M:September / W:38 493 Shift A P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
498 488 2026-09-14 M:September / W:38 509 Shift A P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
497 487 2026-09-14 M:September / W:38 513 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
496 486 2026-09-14 M:September / W:38 707 Shift B P1.CU.2 18.00 x 1220.00 x 2440.00 FA E2 BB CC 40 P:0 / B:40 O:0 / B:40 0.050606 2.024224 Del
495 485 2026-09-15 M:September / W:38 670 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 FA B4 CI 17 G2 60 P:0 / B:60 O:60 / B:0 0.017749 1.064950 Del
494 484 2026-09-14 M:September / W:38 774//786 Shift B P1.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 50 P:2 / B:48 O:0 / B:48 0.041675 2.083760 Del
493 483 2026-09-15 M:September / W:38 775 Shift A P1.CU.1 15.00 x 920.00 x 2440.00 FA B4 CI 17 50 P:0 / B:50 O:0 / B:50 0.031427 1.571360 Del
492 482 2026-09-14 M:September / W:38 800 Shift B P1.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 29 P:0 / B:29 O:0 / B:29 0.041675 1.208581 Del
491 481 2026-09-15 M:September / W:38 799 Shift A P1.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 50 P:0 / B:50 O:0 / B:50 0.041675 2.083760 Del
490 480 2026-09-14 M:September / W:38 766 Shift B P1.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 46 P:12 / B:34 O:0 / B:34 0.022773 1.047536 Del