Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
154 378 20.50 1220.00 2440.00 MA B4 G1 0 / 30
153 235 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
152 263/210 2.40 915.00 1830.00 FJB E1 UTY E 0 / 301
151 263/x 2.40 915.00 1830.00 FJB E1 UTY E 0 / 176
150 317/x 2.40 915.00 1830.00 FJB E1 UTY E 0 / 220
149 431 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
148 451/432 2.40 915.00 1830.00 FJB E1 UTY E 0 / 297
147 452/451 2.40 915.00 1830.00 FJB E1 UTY E 0 / 205
146 446 11.60 910.00 1820.00 FA B4 G2 0 / 55
145 409//329 17.60 1230.00 2440.00 MA B4 G1 0 / 35

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
439 427 2026-09-11 M:September / W:37 638 Shift B P1.CU.2 18.00 x 1220.00 x 2440.00 FA B4 BB CC 40 P:6 / B:34 O:0 / B:34 0.050606 2.024224 Del
438 426 2026-09-11 M:September / W:37 661 Shift B P1.CU.2 11.60 x 1220.00 x 2440.00 MA B4 G1 45 P:0 / B:45 O:0 / B:45 0.031554 1.419934 Del
437 425 2026-09-11 M:September / W:37 651 Shift B P1.CU.3 11.60 x 1220.00 x 2440.00 MA B4 G1 39 P:0 / B:39 O:0 / B:39 0.031554 1.230609 Del
436 424 2026-09-11 M:September / W:37 651 Shift B P1.CU.3 11.60 x 1220.00 x 2440.00 MA B4 G1 33 P:0 / B:33 O:0 / B:33 0.031554 1.041285 Del
435 423 2026-09-11 M:September / W:37 652 Shift B P1.CU.1 11.60 x 1220.00 x 2440.00 MA B4 G1 48 P:0 / B:48 O:0 / B:48 0.031554 1.514596 Del
434 422 2026-09-11 M:September / W:37 x Shift B P1.CU.1 11.60 x 1220.00 x 2440.00 MA B4 G1 39 P:0 / B:39 O:0 / B:39 0.031554 1.230609 Del
433 421 2026-09-11 M:September / W:37 665 Shift B P1.CU.3 11.60 x 1220.00 x 2440.00 MA B4 G1 42 P:0 / B:42 O:0 / B:42 0.031554 1.325271 Del
432 420 2026-09-12 M:September / W:37 555 Shift A P1.CU.1 14.60 x 1220.00 x 2440.00 MA B4 G1 30 P:4 / B:26 O:0 / B:26 0.040484 1.214534 Del
431 419 2026-09-11 M:September / W:37 565//555 Shift B P1.CU.2 14.60 x 1220.00 x 2440.00 MA B4 G1 22 P:0 / B:22 O:0 / B:22 0.040484 0.890659 Del
430 418 2026-09-11 M:September / W:37 677//565 Shift B P1.CU.3 14.60 x 1220.00 x 2440.00 MA B4 G1 29 P:0 / B:29 O:0 / B:29 0.040484 1.174050 Del