Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
154 378 20.50 1220.00 2440.00 MA B4 G1 0 / 30
153 235 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
152 263/210 2.40 915.00 1830.00 FJB E1 UTY E 0 / 301
151 263/x 2.40 915.00 1830.00 FJB E1 UTY E 0 / 176
150 317/x 2.40 915.00 1830.00 FJB E1 UTY E 0 / 220
149 431 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
148 451/432 2.40 915.00 1830.00 FJB E1 UTY E 0 / 297
147 452/451 2.40 915.00 1830.00 FJB E1 UTY E 0 / 205
146 446 11.60 910.00 1820.00 FA B4 G2 0 / 55
145 409//329 17.60 1230.00 2440.00 MA B4 G1 0 / 35

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
429 417 2026-09-11 M:September / W:37 875 Shift B P1.CU.4 18.00 x 1220.00 x 2440.00 FA E1 UTY 23 P:0 / B:23 O:0 / B:23 0.050606 1.163929 Del
428 416 2026-09-11 M:September / W:37 x Shift B P1.CU.1 18.00 x 1220.00 x 2440.00 FA E1 UTY 32 P:0 / B:32 O:26 / B:6 0.050606 1.619379 Del
427 415 2026-09-11 M:September / W:37 842 Shift B P1.CU.2 18.00 x 1220.00 x 2440.00 FA E1 UTY 21 P:0 / B:21 O:21 / B:0 0.050606 1.062718 Del
426 414 2026-09-11 M:September / W:37 518 Shift B P1.CU.1 5.00 x 1230.00 x 2440.00 FA E2 CI D2 101 P:0 / B:101 O:0 / B:101 0.012005 1.212485 Del
425 413 2026-09-11 M:September / W:37 671 Shift B P1.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 90 P:4 / B:86 O:0 / B:86 0.011907 1.071648 Del
424 412 2026-09-11 M:September / W:37 563 Shift B P1.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 106 P:2 / B:104 O:0 / B:104 0.011907 1.262163 Del
423 411 2026-09-11 M:September / W:37 333 Shift A P1.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:4 / B:196 O:0 / B:196 0.003181 0.636291 Del
422 410 2026-09-11 M:September / W:37 334 Shift A P1.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:9 / B:191 O:0 / B:191 0.003181 0.636291 Del
421 409 2026-09-11 M:September / W:37 695 Shift A P1.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:2 / B:198 O:0 / B:198 0.003181 0.636291 Del
420 408 2026-09-11 M:September / W:37 701 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 166 P:1 / B:165 O:0 / B:165 0.003181 0.528122 Del