Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
537 778//782 2.40 915.00 1830.00 FM E1 UTY E 232 / 232
536 904 2.40 915.00 1830.00 FM E1 UTY E 0 / 236
535 789 2.40 915.00 1830.00 FM E1 UTY E 0 / 204
534 823//821 8.60 1220.00 2440.00 MA B4 G1 21 / 72
533 777//776 15.00 1220.00 2440.00 FA B4 CI 17 41 / 41
532 796//801 8.60 915.00 1830.00 MA B4 G1 80 / 80
531 x//917 8.60 1220.00 2440.00 MA B4 G1 0 / 68
530 x 15.00 1220.00 2440.00 FA B4 CI 17 0 / 12
528 849//848 14.60 915.00 1830.00 MA B4 G1 60 / 60
527 631 17.60 1220.00 2440.00 FA B4 CI 17 -25 / 39
Total: 536 data
< Prev Halaman 5 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
89 35 2026-09-01 M:9 / W:36 320 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 MA B4 G1 33 P:0 / B:33 O:10 / B:0 0.031813 1.049820 Del
87 329 2026-09-01 M:9 / W:36 125 Shift A P2.CU.3 2.40 x 915.00 x 1830.00 FJB E1 UTY E 111 P:9 / B:102 O:57 / B:88 0.003181 0.353142 Del
86 42 2026-09-01 M:9 / W:36 115 Shift A P2.CU.4 2.40 x 915.00 x 1830.00 FJB E1 UTY E 90 P:0 / B:90 O:90 / B:0 0.003181 0.286331 Del
85 45 2026-09-01 M:9 / W:36 107 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FM E1 UTY E 194 P:3 / B:191 O:191 / B:0 0.003181 0.617202 Del
84 44 2026-09-01 M:9 / W:36 129 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FM E1 UTY E 182 P:1 / B:181 O:181 / B:0 0.003181 0.579025 Del
83 43 2026-09-01 M:9 / W:36 339 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 196 P:2 / B:194 O:194 / B:0 0.003181 0.623565 Del
81 39 2026-09-01 M:9 / W:36 257 Shift A P2.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 31 P:0 / B:31 O:15 / B:0 0.041675 1.291931 Del
80 38 2026-09-01 M:9 / W:36 259 Shift A P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 48 P:0 / B:48 O:48 / B:0 0.041675 2.000410 Del
79 29 2026-09-01 M:9 / W:36 300 Shift A P2.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 50 P:0 / B:50 O:50 / B:0 0.041675 2.083760 Del
78 71 2026-09-02 M:9 / W:36 254 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 24 P:8 / B:16 O:16 / B:176 0.009604 0.230492 Del