Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
537 778//782 2.40 915.00 1830.00 FM E1 UTY E 232 / 232
536 904 2.40 915.00 1830.00 FM E1 UTY E 0 / 236
535 789 2.40 915.00 1830.00 FM E1 UTY E 0 / 204
534 823//821 8.60 1220.00 2440.00 MA B4 G1 21 / 72
533 777//776 15.00 1220.00 2440.00 FA B4 CI 17 41 / 41
532 796//801 8.60 915.00 1830.00 MA B4 G1 80 / 80
531 x//917 8.60 1220.00 2440.00 MA B4 G1 0 / 68
530 x 15.00 1220.00 2440.00 FA B4 CI 17 0 / 12
528 849//848 14.60 915.00 1830.00 MA B4 G1 60 / 60
527 631 17.60 1220.00 2440.00 FA B4 CI 17 -25 / 39
Total: 536 data
< Prev Halaman 5 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
188 350 2026-09-04 M:9 / W:36 244 Shift B P2.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 64 P:0 / B:64 O:0 / B:0 0.017749 1.135947 Del
187 284 2026-09-04 M:9 / W:36 446 Shift B P2.CU.3 11.60 x 910.00 x 1820.00 FA B4 G2 55 P:0 / B:55 O:0 / B:0 0.017556 0.965565 Del
186 99 2026-09-04 M:9 / W:36 378 Shift B P2.CU.2 20.50 x 1220.00 x 2440.00 MA B4 G1 13 P:1 / B:12 O:0 / B:17 0.058048 0.754619 Del
185 349 2026-09-04 M:9 / W:36 324 Shift B P2.CU.2 11.60 x 1230.00 x 2440.00 MA B4 G1 46 P:9 / B:37 O:0 / B:0 0.031813 1.463385 Del
184 103 2026-09-04 M:9 / W:36 416 Shift A P2.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 32 P:2 / B:30 O:0 / B:28 0.017556 0.561783 Del
183 288 2026-09-04 M:9 / W:36 397 Shift A P2.CU.2 2.70 x 915.00 x 1830.00 FJB E1 UTY E 192 P:26 / B:166 O:0 / B:0 0.003684 0.707288 Del
182 92 2026-09-03 M:9 / W:36 8383 Shift A P2.CU.1 3.70 x 1230.00 x 2440.00 FM B4 G1 29 P:18 / B:11 O:0 / B:72 0.009604 0.278511 Del
181 106 2026-09-04 M:9 / W:36 402 Shift A P2.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:1 / B:59 O:0 / B:0 0.017749 1.064950 Del
180 104 2026-09-04 M:9 / W:36 285 Shift B P2.CU.3 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:0 / B:0 0.017556 1.053343 Del
179 348 2026-09-04 M:9 / W:36 446//445 Shift B P2.CU.3 11.60 x 915.00 x 1830.00 FA B4 G2 56 P:0 / B:56 O:0 / B:0 0.017749 0.993954 Del