Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
505 845 11.60 915.00 1830.00 FA B4 G2 -60 / 60
504 670 11.60 915.00 1830.00 FA B4 CI 17 G2 0 / 60
503 705//759 11.60 915.00 1830.00 FA B4 G2 0 / 40
502 847 11.60 915.00 1830.00 FA B4 G2 18 / 59
501 718 11.60 1220.00 2440.00 FA B4 G2 18 / 18
500 604 11.60 915.00 1830.00 FA B4 G2 60 / 60
498 x 11.60 915.00 1830.00 FA B4 G2 0 / 15
496 842 11.60 915.00 1830.00 FA B4 G2 62 / 62
495 860 11.60 915.00 1830.00 FA B4 G2 0 / 59
494 843 11.60 915.00 1830.00 FA B4 G2 0 / 65
Total: 536 data
< Prev Halaman 8 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
171 48 2026-09-03 M:9 / W:36 111 Shift A P2.CU.3 2.40 x 915.00 x 1830.00 FM E1 UTY E 198 P:7 / B:191 O:0 / B:0 0.003181 0.629928 Del
170 112 2026-09-03 M:9 / W:36 367 Shift A P2.CU.1 2.70 x 915.00 x 1830.00 FJB E1 UTY E 72 P:7 / B:65 O:0 / B:128 0.003684 0.265233 Del
168 289 2026-09-03 M:9 / W:36 398 Shift A P2.CU.2 2.70 x 915.00 x 1830.00 FJB E1 UTY E 61 P:0 / B:61 O:0 / B:137 0.003684 0.224711 Del
167 291 2026-09-03 M:9 / W:36 486 Shift A P2.CU.2 2.70 x 915.00 x 1830.00 FJB E1 UTY E 172 P:8 / B:164 O:0 / B:0 0.003684 0.633612 Del
166 281 2026-09-03 M:9 / W:36 337 Shift B P2.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 25 P:0 / B:25 O:0 / B:14 0.031813 0.795318 Del
164 347 2026-09-03 M:9 / W:36 8384 Shift B P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 157 P:27 / B:130 O:0 / B:42 0.009604 1.507803 Del
163 95 2026-09-03 M:9 / W:36 328 Shift A P2.CU.1 17.60 x 1230.00 x 2440.00 MA B4 G1 10 P:0 / B:10 O:0 / B:30 0.049820 0.498199 Del
162 346 2026-09-03 M:9 / W:36 358/353 Shift A P2.CU.2 17.60 x 1230.00 x 2440.00 MA B4 G1 40 P:5 / B:35 O:0 / B:0 0.049820 1.992797 Del
161 95 2026-09-03 M:9 / W:36 328 Shift A P2.CU.2 17.60 x 1230.00 x 2440.00 MA B4 G1 26 P:0 / B:26 O:0 / B:14 0.049820 1.295318 Del
160 103 2026-09-03 M:9 / W:36 416 Shift A P2.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 28 P:0 / B:28 O:0 / B:32 0.017556 0.491560 Del