Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
505 845 11.60 915.00 1830.00 FA B4 G2 -60 / 60
504 670 11.60 915.00 1830.00 FA B4 CI 17 G2 0 / 60
503 705//759 11.60 915.00 1830.00 FA B4 G2 0 / 40
502 847 11.60 915.00 1830.00 FA B4 G2 18 / 59
501 718 11.60 1220.00 2440.00 FA B4 G2 18 / 18
500 604 11.60 915.00 1830.00 FA B4 G2 60 / 60
498 x 11.60 915.00 1830.00 FA B4 G2 0 / 15
496 842 11.60 915.00 1830.00 FA B4 G2 62 / 62
495 860 11.60 915.00 1830.00 FA B4 G2 0 / 59
494 843 11.60 915.00 1830.00 FA B4 G2 0 / 65
Total: 536 data
< Prev Halaman 8 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
141 100 2026-09-03 M:9 / W:36 346 Shift A P2.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 31 P:2 / B:29 O:0 / B:0 0.058048 1.799476 Del
138 153 2026-09-24 M:9 / W:39 x Shift A P2.CU.1 11.60 x 920.00 x 1830.00 MA B4 G1 51 P:0 / B:51 O:0 / B:0 0.017846 0.910154 Del
137 93 2026-09-03 M:9 / W:36 353/352 Shift B P2.CU.1 17.60 x 1230.00 x 2440.00 MA B4 G1 15 P:4 / B:11 O:0 / B:8 0.049820 0.747299 Del
133 64 2026-09-03 M:9 / W:36 8309 Shift A P2.CU.3 3.70 x 1220.00 x 2440.00 FM B4 G1 18 P:13 / B:5 O:0 / B:179 0.009526 0.171464 Del
130 141 2026-09-02 M:9 / W:36 x Shift B P2.CU.3 3.70 x 1220.00 x 2440.00 FM B4 G1 23 P:0 / B:23 O:0 / B:50 0.009526 0.219092 Del
128 37 2026-09-02 M:9 / W:36 382 Shift A P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 22 P:0 / B:22 O:0 / B:0 0.041675 0.916854 Del
127 30 2026-09-02 M:9 / W:36 279 Shift B P2.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 29 P:0 / B:29 O:0 / B:21 0.041675 1.208581 Del
126 69 2026-09-02 M:9 / W:36 349 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 FA B4 G2 61 P:3 / B:58 O:0 / B:0 0.031813 1.940576 Del
124 82 2026-09-02 M:9 / W:36 50 Shift B P2.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:0 0.017749 1.064950 Del
123 79 2026-09-02 M:9 / W:36 381 Shift B P2.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 59 P:0 / B:59 O:0 / B:0 0.017749 1.047201 Del