Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
399 689 2.70 920.00 1830.00 ALAS B4 0 / 204
398 624 2.70 1220.00 2440.00 FA E1 UTY 105 / 198
397 x 14.60 1220.00 2440.00 MA B4 G1 0 / 39
395 666 2.70 1220.00 2440.00 FA E1 UTY 170 / 198
394 664 11.60 1220.00 2440.00 MA B4 G1 0 / 63
393 651 11.60 1220.00 2440.00 MA B4 G1 39 / 39
392 646 2.70 1220.00 2440.00 FA E1 UTY 15 / 187
391 294 2.70 1220.00 2440.00 FA E2 D1 D2 0 / 196
390 477 11.60 910.00 1820.00 FA B4 G2 0 / 34
389 491//483 18.00 1220.00 2440.00 FM E2 CI 17 0 / 40
Total: 536 data
< Prev Halaman 18 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
109 337 2026-09-02 M:9 / W:36 x Shift A P2.CU.1 8.60 x 915.00 x 1830.00 MA B4 G2 14 P:0 / B:14 O:0 / B:0 0.012726 0.178161 Del
108 338 2026-09-02 M:9 / W:36 x Shift A P2.CU.1 8.60 x 915.00 x 1830.00 MA B4 G2 7 P:0 / B:7 O:0 / B:0 0.012726 0.089081 Del
107 30 2026-09-02 M:9 / W:36 279 Shift A P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 21 P:0 / B:21 O:0 / B:29 0.041675 0.875179 Del
104 56 2026-09-02 M:9 / W:36 364 Shift A P2.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 40 P:0 / B:40 O:40 / B:0 0.022897 0.915878 Del
100 334 2026-09-02 M:9 / W:36 126 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 186 P:3 / B:183 O:183 / B:14 0.003181 0.591751 Del
99 329 2026-09-02 M:9 / W:36 125 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 45 P:7 / B:38 O:38 / B:161 0.003181 0.143165 Del
98 333 2026-09-02 M:9 / W:36 8382 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 200 P:7 / B:193 O:60 / B:7 0.009604 1.920768 Del
97 70 2026-09-02 M:9 / W:36 385 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 27 P:5 / B:22 O:22 / B:151 0.009604 0.259304 Del
96 332 2026-09-01 M:9 / W:36 319//323 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 MA B4 G1 43 P:4 / B:39 O:39 / B:0 0.031813 1.367947 Del
94 331 2026-09-01 M:9 / W:36 124 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 38 P:0 / B:38 O:38 / B:153 0.003181 0.120895 Del