Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
388 291 2.70 1220.00 2440.00 FA E2 D1 D2 0 / 197
387 303 2.70 1220.00 2440.00 FA E2 D1 D2 0 / 139
386 492 18.00 1220.00 2440.00 FM E2 CI 17 0 / 31
384 x 2.70 1220.00 2440.00 FA E2 CI D2 0 / 111
383 693//692 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 100
382 710 5.00 920.00 2440.00 FM E1 UTY E 0 / 100
381 x 11.20 1220.00 2440.00 FM E1 BB CC 0 / 11
380 583 11.20 1220.00 2440.00 FM E1 BB CC 0 / 40
379 747 2.70 1220.00 2440.00 FA E1 UTY 59 / 199
378 447 11.60 915.00 1830.00 FA B4 G2 0 / 60
Total: 536 data
< Prev Halaman 19 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
97 70 2026-09-02 M:9 / W:36 385 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 27 P:5 / B:22 O:22 / B:151 0.009604 0.259304 Del
96 332 2026-09-01 M:9 / W:36 319//323 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 MA B4 G1 43 P:4 / B:39 O:39 / B:0 0.031813 1.367947 Del
94 331 2026-09-01 M:9 / W:36 124 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 38 P:0 / B:38 O:38 / B:153 0.003181 0.120895 Del
93 330 2026-09-01 M:9 / W:36 135 Shift B P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:3 / B:197 O:106 / B:0 0.003181 0.636291 Del
92 34 2026-09-01 M:9 / W:36 170//199 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 MA B4 G1 59 P:4 / B:55 O:55 / B:0 0.031813 1.876950 Del
90 40 2026-09-01 M:9 / W:36 257/382 Shift A P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 47 P:1 / B:46 O:46 / B:0 0.041675 1.958734 Del
89 35 2026-09-01 M:9 / W:36 320 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 MA B4 G1 33 P:0 / B:33 O:10 / B:0 0.031813 1.049820 Del
87 329 2026-09-01 M:9 / W:36 125 Shift A P2.CU.3 2.40 x 915.00 x 1830.00 FJB E1 UTY E 111 P:9 / B:102 O:57 / B:88 0.003181 0.353142 Del
86 42 2026-09-01 M:9 / W:36 115 Shift A P2.CU.4 2.40 x 915.00 x 1830.00 FJB E1 UTY E 90 P:0 / B:90 O:90 / B:0 0.003181 0.286331 Del
85 45 2026-09-01 M:9 / W:36 107 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FM E1 UTY E 194 P:3 / B:191 O:191 / B:0 0.003181 0.617202 Del