Data Referensi (Sanding P2)
Daftar referensi data Sanding P2
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 388 | 291 | 2.70 | 1220.00 | 2440.00 | FA E2 D1 D2 | 0 / 197 | |
| 387 | 303 | 2.70 | 1220.00 | 2440.00 | FA E2 D1 D2 | 0 / 139 | |
| 386 | 492 | 18.00 | 1220.00 | 2440.00 | FM E2 CI 17 | 0 / 31 | |
| 384 | x | 2.70 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 111 | |
| 383 | 693//692 | 5.00 | 915.00 | 1830.00 | FM E2 LKL C11 7 | 0 / 100 | |
| 382 | 710 | 5.00 | 920.00 | 2440.00 | FM E1 UTY E | 0 / 100 | |
| 381 | x | 11.20 | 1220.00 | 2440.00 | FM E1 BB CC | 0 / 11 | |
| 380 | 583 | 11.20 | 1220.00 | 2440.00 | FM E1 BB CC | 0 / 40 | |
| 379 | 747 | 2.70 | 1220.00 | 2440.00 | FA E1 UTY | 59 / 199 | |
| 378 | 447 | 11.60 | 915.00 | 1830.00 | FA B4 G2 | 0 / 60 |
Form Input Grading P2
Silakan isi data dengan lengkap dan benar
Rekap Data Grading P2
Daftar riwayat dan rekapitulasi data hasil grading P2
| ID Grading | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Grading | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 80 | 38 | 2026-09-01 | M:9 / W:36 | 259 | Shift A | P2.CU.1 | 15.00 x 1220.00 x 2440.00 | FA B4 CI 17 | 48 | P:0 / B:48 | O:48 / B:0 | 0.041675 | 2.000410 | Del |
| 79 | 29 | 2026-09-01 | M:9 / W:36 | 300 | Shift A | P2.CU.3 | 15.00 x 1220.00 x 2440.00 | FA B4 CI 17 | 50 | P:0 / B:50 | O:50 / B:0 | 0.041675 | 2.083760 | Del |
| 78 | 71 | 2026-09-02 | M:9 / W:36 | 254 | Shift A | P2.CU.2 | 3.70 x 1230.00 x 2440.00 | FM B4 G1 | 24 | P:8 / B:16 | O:16 / B:176 | 0.009604 | 0.230492 | Del |
| 75 | 165 | 2026-09-08 | M:9 / W:37 | 503 | Shift A | P2.CU.2 | 5.00 x 1220.00 x 2440.00 | FA E2 CI D2 | 100 | P:0 / B:100 | O:100 / B:0 | 0.011907 | 1.190720 | Del |
| 74 | 328 | 2026-09-08 | M:9 / W:37 | 218 | Shift A | P2.CU.2 | 9.00 x 1220.00 x 2440.00 | FM E2 CI 17 | 66 | P:3 / B:63 | O:63 / B:0 | 0.023814 | 1.571750 | Del |
| 69 | 325 | 2026-09-08 | M:9 / W:37 | 46 | Shift B | P2.CU.2 | 8.20 x 1220.00 x 2440.00 | FM E1 BB CC | 6 | P:5 / B:1 | O:60 / B:59 | 0.021433 | 0.128598 | Del |
| 67 | 323 | 2026-09-08 | M:9 / W:37 | 939 | Shift B | P2.CU.3 | 8.20 x 1220.00 x 2440.00 | FM E1 BB CC | 23 | P:5 / B:18 | O:18 / B:47 | 0.021433 | 0.492958 | Del |
| 63 | 166 | 2026-09-08 | M:9 / W:37 | 542 | Shift A | P2.CU.1 | 5.00 x 1220.00 x 2440.00 | FA E2 CI D2 | 90 | P:0 / B:90 | O:90 / B:0 | 0.011907 | 1.071648 | Del |
| 62 | 140 | 2026-09-07 | M:9 / W:37 | x | Shift A | P2.CU.2 | 3.70 x 1220.00 x 2440.00 | FM B4 G1 | 67 | P:16 / B:51 | O:51 / B:116 | 0.009526 | 0.638226 | Del |
| 61 | 322 | 2026-09-07 | M:9 / W:37 | 454 | Shift B | P2.CU.1 | 11.60 x 1230.00 x 2440.00 | FA B4 G2 | 60 | P:4 / B:56 | O:56 / B:0 | 0.031813 | 1.908763 | Del |