Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
569 x 20.50 1220.00 2440.00 FM B4 G1 0 / 5
568 64 18.00 1220.00 2440.00 FA B4 0 / 29
567 788 2.40 915.00 1830.00 FM E1 UTY E 0 / 193
566 752 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
565 745 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
564 746 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
563 806 2.40 915.00 1830.00 FM E1 UTY E 0 / 173
562 790 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
561 805 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
560 784 2.40 915.00 1830.00 FM E1 UTY E 0 / 199

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
352 337 2026-09-09 M:September / W:37 x Shift A P1.CU.2 9.00 x 1220.00 x 2440.00 FM E2 CI 17 52 P:0 / B:52 O:0 / B:52 0.023814 1.238349 Del
351 336 2026-09-08 M:September / W:37 591 Shift B P1.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 76 P:0 / B:76 O:0 / B:76 0.011907 0.904947 Del
350 335 2026-09-08 M:September / W:37 483//491 Shift B P1.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 40 P:0 / B:40 O:0 / B:40 0.050606 2.024224 Del
349 334 2026-09-08 M:September / W:37 x//301 Shift A P1.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 31 P:0 / B:31 O:0 / B:31 0.050606 1.568774 Del
348 333 2026-09-08 M:September / W:37 456/x Shift A P1.CU.2 18.00 x 1220.00 x 2440.00 FM E1 UTY E 32 P:0 / B:32 O:0 / B:32 0.050606 1.619379 Del
347 332 2026-09-08 M:September / W:37 548 Shift B P1.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 100 P:0 / B:100 O:0 / B:100 0.011907 1.190720 Del
346 331 2026-09-08 M:September / W:37 594 Shift B P1.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 107 P:0 / B:107 O:0 / B:107 0.011907 1.274070 Del
345 330 2026-09-08 M:September / W:37 595 Shift B P1.CU.2 2.70 x 1220.00 x 2440.00 FA E2 CI D2 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
344 329 2026-09-08 M:September / W:37 608 Shift B P1.CU.1 2.70 x 1220.00 x 2440.00 FA E2 CI D2 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
343 328 2026-09-08 M:September / W:37 531 Shift B P1.CU.1 2.70 x 1220.00 x 2440.00 FA E2 CI D2 220 P:0 / B:220 O:0 / B:220 0.006549 1.440771 Del