Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
549 835 11.60 915.00 1830.00 FA B4 G2 0 / 49
548 841 11.60 915.00 1830.00 FA B4 G2 0 / 50
547 679 11.60 915.00 1830.00 FA B4 G2 0 / 41
546 681//679 11.60 915.00 1830.00 FA B4 G2 0 / 59
545 680 11.60 915.00 1830.00 FA B4 G2 0 / 64
544 496 2.70 1220.00 2440.00 FA E1 UTY 226 / 226
543 748 2.70 1220.00 2440.00 FA E1 UTY 200 / 200
542 581 2.70 1220.00 2440.00 FA E1 UTY 200 / 200
541 490 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
540 838 2.70 1220.00 2440.00 FA E1 UTY 200 / 200

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
352 337 2026-09-09 M:September / W:37 x Shift A P1.CU.2 9.00 x 1220.00 x 2440.00 FM E2 CI 17 52 P:0 / B:52 O:0 / B:52 0.023814 1.238349 Del
351 336 2026-09-08 M:September / W:37 591 Shift B P1.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 76 P:0 / B:76 O:0 / B:76 0.011907 0.904947 Del
350 335 2026-09-08 M:September / W:37 483//491 Shift B P1.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 40 P:0 / B:40 O:0 / B:40 0.050606 2.024224 Del
349 334 2026-09-08 M:September / W:37 x//301 Shift A P1.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 31 P:0 / B:31 O:0 / B:31 0.050606 1.568774 Del
348 333 2026-09-08 M:September / W:37 456/x Shift A P1.CU.2 18.00 x 1220.00 x 2440.00 FM E1 UTY E 32 P:0 / B:32 O:0 / B:32 0.050606 1.619379 Del
347 332 2026-09-08 M:September / W:37 548 Shift B P1.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 100 P:0 / B:100 O:0 / B:100 0.011907 1.190720 Del
346 331 2026-09-08 M:September / W:37 594 Shift B P1.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 107 P:0 / B:107 O:0 / B:107 0.011907 1.274070 Del
345 330 2026-09-08 M:September / W:37 595 Shift B P1.CU.2 2.70 x 1220.00 x 2440.00 FA E2 CI D2 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
344 329 2026-09-08 M:September / W:37 608 Shift B P1.CU.1 2.70 x 1220.00 x 2440.00 FA E2 CI D2 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
343 328 2026-09-08 M:September / W:37 531 Shift B P1.CU.1 2.70 x 1220.00 x 2440.00 FA E2 CI D2 220 P:0 / B:220 O:0 / B:220 0.006549 1.440771 Del