Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
417 875 18.00 1220.00 2440.00 FA E1 UTY 0 / 23
416 x 18.00 1220.00 2440.00 FA E1 UTY 0 / 32
415 842 18.00 1220.00 2440.00 FA E1 UTY 0 / 21
414 518 5.00 1230.00 2440.00 FA E2 CI D2 0 / 101
413 671 5.00 1220.00 2440.00 FA E2 CI D2 0 / 90
412 563 5.00 1220.00 2440.00 FA E2 CI D2 0 / 106
411 333 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
410 334 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
409 695 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
408 701 2.40 915.00 1830.00 FJB E1 UTY E 0 / 166

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
342 327 2026-09-08 M:September / W:37 603 Shift B P1.CU.2 2.70 x 1220.00 x 2440.00 FA E2 CI D2 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
341 326 2026-09-08 M:September / W:37 596 Shift B P1.CU.2 2.70 x 1220.00 x 2440.00 FA E2 CI D2 196 P:0 / B:196 O:0 / B:196 0.006549 1.283596 Del
340 325 2026-09-08 M:September / W:37 541 Shift B P1.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 100 P:0 / B:100 O:0 / B:100 0.011907 1.190720 Del
339 324 2026-09-08 M:September / W:37 511 Shift B P1.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 100 P:1 / B:99 O:0 / B:99 0.011907 1.190720 Del
338 323 2026-09-08 M:September / W:37 517 Shift B P1.CU.1 5.00 x 1220.00 x 2440.00 FA E2 CI D2 65 P:1 / B:64 O:0 / B:64 0.011907 0.773968 Del
337 322 2026-09-08 M:September / W:37 591//517 Shift B P1.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 48 P:0 / B:48 O:0 / B:48 0.011907 0.571546 Del
336 321 2026-09-08 M:September / W:37 522 Shift B P1.CU.1 5.00 x 1220.00 x 2440.00 FA E2 CI D2 104 P:0 / B:104 O:0 / B:104 0.011907 1.238349 Del
335 320 2026-09-08 M:September / W:37 504 Shift A P1.CU.1 5.00 x 1220.00 x 2440.00 FA E2 CI D2 72 P:5 / B:67 O:0 / B:67 0.011907 0.857318 Del
334 319 2026-09-08 M:September / W:37 52//29 Shift A P1.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 20 P:0 / B:20 O:0 / B:20 0.050606 1.012112 Del
333 318 2026-09-08 M:September / W:37 556 Shift A P1.CU.2 20.50 x 1220.00 x 2440.00 MA B4 G1 35 P:5 / B:30 O:0 / B:30 0.058048 2.031666 Del