Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
572 x 15.00 1220.00 2440.00 FA B4 BB CC LU DRI P 0 / 6
571 897 15.00 1220.00 2440.00 FA B4 CI 17 0 / 50
570 891 8.60 1220.00 2440.00 MA B4 G1 79 / 79
569 894//890 8.60 1220.00 2440.00 MA B4 G1 0 / 80
567 822 8.60 1220.00 2440.00 MA B4 G1 0 / 76
565 890//x 8.60 1220.00 2440.00 MA B4 G1 0 / 80
563 858 3.00 1220.00 2440.00 FA B4 BB CC 0 / 200
560 821 8.60 1220.00 2440.00 MA B4 G1 0 / 65
559 815//785 2.40 915.00 1830.00 FM E1 UTY E 0 / 231
558 728 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
Total: 521 data
< Prev Halaman 1 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
99 329 2026-09-02 M:9 / W:36 125 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 45 P:7 / B:38 O:38 / B:161 0.003181 0.143165 Del
98 333 2026-09-02 M:9 / W:36 8382 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 200 P:7 / B:193 O:60 / B:7 0.009604 1.920768 Del
97 70 2026-09-02 M:9 / W:36 385 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 27 P:5 / B:22 O:22 / B:151 0.009604 0.259304 Del
96 332 2026-09-01 M:9 / W:36 319//323 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 MA B4 G1 43 P:4 / B:39 O:39 / B:0 0.031813 1.367947 Del
94 331 2026-09-01 M:9 / W:36 124 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 38 P:0 / B:38 O:38 / B:153 0.003181 0.120895 Del
93 330 2026-09-01 M:9 / W:36 135 Shift B P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:3 / B:197 O:106 / B:0 0.003181 0.636291 Del
92 34 2026-09-01 M:9 / W:36 170//199 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 MA B4 G1 59 P:4 / B:55 O:55 / B:0 0.031813 1.876950 Del
90 40 2026-09-01 M:9 / W:36 257/382 Shift A P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 47 P:1 / B:46 O:46 / B:0 0.041675 1.958734 Del
89 35 2026-09-01 M:9 / W:36 320 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 MA B4 G1 33 P:0 / B:33 O:10 / B:0 0.031813 1.049820 Del
87 329 2026-09-01 M:9 / W:36 125 Shift A P2.CU.3 2.40 x 915.00 x 1830.00 FJB E1 UTY E 111 P:9 / B:102 O:57 / B:88 0.003181 0.353142 Del