Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
414 638 18.00 1220.00 2440.00 FA B4 BB CC 0 / 34
413 588 18.00 1220.00 2440.00 FA B4 BB CC 0 / 35
412 x//861 11.60 915.00 1830.00 FA B4 G2 60 / 60
411 613 11.60 915.00 1830.00 FA B4 G2 0 / 60
410 585 18.00 1220.00 2440.00 FA B4 BB CC 0 / 31
409 661 11.60 1220.00 2440.00 MA B4 G1 0 / 45
408 652 11.60 1220.00 2440.00 MA B4 G1 0 / 48
407 586 18.00 1220.00 2440.00 FA B4 BB CC 0 / 32
406 668 18.00 1220.00 2440.00 FA B4 BB CC 0 / 41
405 509 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
Total: 521 data
< Prev Halaman 15 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
131 92 2026-09-03 M:9 / W:36 8383 Shift B P2.CU.1 3.70 x 1230.00 x 2440.00 FM B4 G1 72 P:47 / B:25 O:0 / B:29 0.009604 0.691476 Del
130 141 2026-09-02 M:9 / W:36 x Shift B P2.CU.3 3.70 x 1220.00 x 2440.00 FM B4 G1 23 P:0 / B:23 O:0 / B:50 0.009526 0.219092 Del
129 140 2026-09-02 M:9 / W:36 x Shift B P2.CU.1 3.70 x 1220.00 x 2440.00 FM B4 G1 116 P:79 / B:37 O:0 / B:67 0.009526 1.104988 Del
128 37 2026-09-02 M:9 / W:36 382 Shift A P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 22 P:0 / B:22 O:0 / B:0 0.041675 0.916854 Del
127 30 2026-09-02 M:9 / W:36 279 Shift B P2.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 29 P:0 / B:29 O:0 / B:21 0.041675 1.208581 Del
126 69 2026-09-02 M:9 / W:36 349 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 FA B4 G2 61 P:3 / B:58 O:0 / B:0 0.031813 1.940576 Del
125 71 2026-09-02 M:9 / W:36 254 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 35 P:18 / B:17 O:0 / B:165 0.009604 0.336134 Del
124 82 2026-09-02 M:9 / W:36 50 Shift B P2.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:0 0.017749 1.064950 Del
123 79 2026-09-02 M:9 / W:36 381 Shift B P2.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 59 P:0 / B:59 O:0 / B:0 0.017749 1.047201 Del
121 59 2026-09-02 M:9 / W:36 297+368 Shift B P2.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 45 P:1 / B:44 O:0 / B:0 0.022897 1.030363 Del