Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
435 569 2.70 1220.00 2440.00 FA E1 UTY 196 / 196
434 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 6
433 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 198
432 x 2.70 1220.00 2440.00 FA E2 D1 D2 0 / 199
431 780 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
429 775 15.00 920.00 2440.00 FA B4 CI 17 0 / 50
428 707 18.00 1220.00 2440.00 FA E2 BB CC 0 / 40
427 708 18.00 1220.00 2440.00 FA E2 BB CC 0 / 34
426 513 2.70 1220.00 2440.00 FA E1 UTY 165 / 200
425 715//714 6.00 1220.00 2440.00 FA B4 BB CC 0 / 65
Total: 521 data
< Prev Halaman 13 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
104 56 2026-09-02 M:9 / W:36 364 Shift A P2.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 40 P:0 / B:40 O:40 / B:0 0.022897 0.915878 Del
103 54 2026-09-02 M:9 / W:36 298 Shift A P2.CU.3 14.60 x 920.00 x 1830.00 MA B4 G1 52 P:3 / B:49 O:49 / B:0 0.022897 1.190642 Del
102 334 2026-09-02 M:9 / W:36 126 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 14 P:0 / B:14 O:14 / B:186 0.003181 0.044540 Del
100 334 2026-09-02 M:9 / W:36 126 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 186 P:3 / B:183 O:183 / B:14 0.003181 0.591751 Del
99 329 2026-09-02 M:9 / W:36 125 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 45 P:7 / B:38 O:38 / B:161 0.003181 0.143165 Del
98 333 2026-09-02 M:9 / W:36 8382 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 200 P:7 / B:193 O:60 / B:7 0.009604 1.920768 Del
97 70 2026-09-02 M:9 / W:36 385 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 27 P:5 / B:22 O:22 / B:151 0.009604 0.259304 Del
96 332 2026-09-01 M:9 / W:36 319//323 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 MA B4 G1 43 P:4 / B:39 O:39 / B:0 0.031813 1.367947 Del
94 331 2026-09-01 M:9 / W:36 124 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 38 P:0 / B:38 O:38 / B:153 0.003181 0.120895 Del
93 330 2026-09-01 M:9 / W:36 135 Shift B P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:3 / B:197 O:106 / B:0 0.003181 0.636291 Del