Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
435 569 2.70 1220.00 2440.00 FA E1 UTY 196 / 196
434 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 6
433 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 198
432 x 2.70 1220.00 2440.00 FA E2 D1 D2 0 / 199
431 780 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
429 775 15.00 920.00 2440.00 FA B4 CI 17 0 / 50
428 707 18.00 1220.00 2440.00 FA E2 BB CC 0 / 40
427 708 18.00 1220.00 2440.00 FA E2 BB CC 0 / 34
426 513 2.70 1220.00 2440.00 FA E1 UTY 165 / 200
425 715//714 6.00 1220.00 2440.00 FA B4 BB CC 0 / 65
Total: 521 data
< Prev Halaman 13 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
80 38 2026-09-01 M:9 / W:36 259 Shift A P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 48 P:0 / B:48 O:48 / B:0 0.041675 2.000410 Del
79 29 2026-09-01 M:9 / W:36 300 Shift A P2.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 50 P:0 / B:50 O:50 / B:0 0.041675 2.083760 Del
78 71 2026-09-02 M:9 / W:36 254 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 24 P:8 / B:16 O:16 / B:176 0.009604 0.230492 Del
77 164 2026-09-23 M:9 / W:39 502 Shift A P2.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 96 P:1 / B:95 O:96 / B:0 0.011907 1.143091 Del
75 165 2026-09-08 M:9 / W:37 503 Shift A P2.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 100 P:0 / B:100 O:100 / B:0 0.011907 1.190720 Del
74 328 2026-09-08 M:9 / W:37 218 Shift A P2.CU.2 9.00 x 1220.00 x 2440.00 FM E2 CI 17 66 P:3 / B:63 O:63 / B:0 0.023814 1.571750 Del
73 170 2026-09-08 M:9 / W:37 450//440 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 121 P:3 / B:118 O:118 / B:57 0.003181 0.384956 Del
72 51 2026-09-08 M:9 / W:37 420//x Shift B P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 28 P:0 / B:28 O:28 / B:0 0.041675 1.166906 Del
70 327 2026-09-08 M:9 / W:37 435 Shift B P2.CU.2 18.00 x 1220.00 x 2440.00 FM E2 CI 17 29 P:0 / B:29 O:0 / B:0 0.050606 1.467562 Del
69 325 2026-09-08 M:9 / W:37 46 Shift B P2.CU.2 8.20 x 1220.00 x 2440.00 FM E1 BB CC 6 P:5 / B:1 O:60 / B:59 0.021433 0.128598 Del