Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
414 638 18.00 1220.00 2440.00 FA B4 BB CC 0 / 34
413 588 18.00 1220.00 2440.00 FA B4 BB CC 0 / 35
412 x//861 11.60 915.00 1830.00 FA B4 G2 60 / 60
411 613 11.60 915.00 1830.00 FA B4 G2 0 / 60
410 585 18.00 1220.00 2440.00 FA B4 BB CC 0 / 31
409 661 11.60 1220.00 2440.00 MA B4 G1 0 / 45
408 652 11.60 1220.00 2440.00 MA B4 G1 0 / 48
407 586 18.00 1220.00 2440.00 FA B4 BB CC 0 / 32
406 668 18.00 1220.00 2440.00 FA B4 BB CC 0 / 41
405 509 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
Total: 521 data
< Prev Halaman 15 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
69 325 2026-09-08 M:9 / W:37 46 Shift B P2.CU.2 8.20 x 1220.00 x 2440.00 FM E1 BB CC 6 P:5 / B:1 O:60 / B:59 0.021433 0.128598 Del
67 323 2026-09-08 M:9 / W:37 939 Shift B P2.CU.3 8.20 x 1220.00 x 2440.00 FM E1 BB CC 23 P:5 / B:18 O:18 / B:47 0.021433 0.492958 Del
63 166 2026-09-08 M:9 / W:37 542 Shift A P2.CU.1 5.00 x 1220.00 x 2440.00 FA E2 CI D2 90 P:0 / B:90 O:90 / B:0 0.011907 1.071648 Del
62 140 2026-09-07 M:9 / W:37 x Shift A P2.CU.2 3.70 x 1220.00 x 2440.00 FM B4 G1 67 P:16 / B:51 O:51 / B:116 0.009526 0.638226 Del
61 322 2026-09-07 M:9 / W:37 454 Shift B P2.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:4 / B:56 O:56 / B:0 0.031813 1.908763 Del
60 273 2026-09-07 M:9 / W:37 476 Shift A P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 16 P:0 / B:16 O:16 / B:15 0.041675 0.666803 Del
59 154 2026-09-07 M:9 / W:37 478//471 Shift A P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 50 P:0 / B:50 O:50 / B:0 0.041675 2.083760 Del
57 321 2026-09-07 M:9 / W:37 510 Shift A P2.CU.1 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:60 / B:0 0.017556 1.053343 Del
54 285 2026-09-07 M:9 / W:37 430 Shift A P2.CU.1 11.60 x 1220.00 x 2440.00 FA B4 G2 51 P:3 / B:48 O:48 / B:0 0.031554 1.609258 Del
53 320 2026-09-07 M:9 / W:37 354 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 40 P:4 / B:36 O:37 / B:0 0.031813 1.272509 Del