Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
394 658 2.70 1220.00 2440.00 FA E1 UTY 0 / 204
393 616 11.60 915.00 1830.00 FA B4 G2 0 / 55
392 612 11.60 915.00 1830.00 FA B4 G2 0 / 50
391 617 11.60 915.00 1830.00 FA B4 G2 0 / 62
390 530 20.50 1220.00 2440.00 MA B4 G1 0 / 18
389 x 11.20 1220.00 2440.00 FM E1 BB CC 0 / 12
388 105 11.20 1220.00 2440.00 FM E1 BB CC 0 / 40
387 579 11.20 1220.00 2440.00 FM E1 BB CC 0 / 45
386 632 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
385 624 2.70 1220.00 2440.00 FA E1 UTY 0 / 202

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
228 213 2026-09-04 M:September / W:36 394 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 56 P:0 / B:56 O:56 / B:0 0.031813 1.781512 Del
227 212 2026-09-04 M:September / W:36 419 Shift A P1.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.031813 1.908763 Del
226 211 2026-09-04 M:September / W:36 435//301 Shift B P1.CU.2 18.00 x 1220.00 x 2440.00 FM E2 CI 17 26 P:11 / B:15 O:0 / B:15 0.050606 1.315746 Del
225 210 2026-09-04 M:September / W:36 435 Shift B P1.CU.2 18.00 x 1220.00 x 2440.00 FM E2 CI 17 29 P:0 / B:29 O:29 / B:0 0.050606 1.467562 Del
224 209 2026-09-09 M:September / W:37 x Shift A P1.CU.2 3.00 x 1220.00 x 2440.00 FA B4 BB CC 200 P:7 / B:193 O:0 / B:193 0.007442 1.488400 Del
223 208 2026-09-03 M:September / W:36 448 Shift B P1.CU.6 11.60 x 910.00 x 1820.00 FA B4 G2 41 P:0 / B:41 O:0 / B:41 0.017556 0.719785 Del
222 207 2026-09-03 M:September / W:36 477 Shift B P1.CU.7 11.60 x 910.00 x 1820.00 FA B4 G2 48 P:14 / B:34 O:0 / B:34 0.017556 0.842675 Del
221 206 2026-09-03 M:September / W:36 469 Shift B P1.CU.9 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017556 1.053343 Del
220 205 2026-09-03 M:September / W:36 467 Shift B P1.CU.9 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017556 1.053343 Del
219 204 2026-09-03 M:September / W:36 463 Shift B P1.CU.8 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:2 / B:48 O:0 / B:48 0.022897 1.144848 Del