Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
336 591 5.00 1220.00 2440.00 FA E2 CI D2 0 / 76
335 483//491 18.00 1220.00 2440.00 FM E1 UTY E 0 / 40
334 x//301 18.00 1220.00 2440.00 FM E1 UTY E 0 / 31
333 456/x 18.00 1220.00 2440.00 FM E1 UTY E 0 / 32
332 548 5.00 1220.00 2440.00 FA E2 CI D2 0 / 100
331 594 5.00 1220.00 2440.00 FA E2 CI D2 0 / 107
330 595 2.70 1220.00 2440.00 FA E2 CI D2 0 / 200
329 608 2.70 1220.00 2440.00 FA E2 CI D2 0 / 200
328 531 2.70 1220.00 2440.00 FA E2 CI D2 0 / 220
327 603 2.70 1220.00 2440.00 FA E2 CI D2 0 / 200

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
172 155 2026-09-02 M:September / W:36 346 Shift A P1.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 31 P:0 / B:31 O:0 / B:31 0.058048 1.799476 Del
171 154 2026-09-02 M:September / W:36 378 Shift A P1.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 30 P:0 / B:30 O:0 / B:30 0.058048 1.741428 Del
170 153 2026-09-02 M:September / W:36 235 Shift B P1.CU.10 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:18 / B:182 O:0 / B:182 0.003181 0.636291 Del
169 152 2026-09-02 M:September / W:36 263/210 Shift B P1.CU.10 2.40 x 915.00 x 1830.00 FJB E1 UTY E 301 P:7 / B:294 O:0 / B:294 0.003181 0.957618 Del
168 151 2026-09-02 M:September / W:36 263/x Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 176 P:3 / B:173 O:0 / B:173 0.003181 0.559936 Del
167 150 2026-09-02 M:September / W:36 317/x Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 220 P:4 / B:216 O:0 / B:216 0.003181 0.699920 Del
166 149 2026-09-02 M:September / W:36 431 Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:0 / B:200 O:0 / B:200 0.003181 0.636291 Del
165 148 2026-09-02 M:September / W:36 451/432 Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 297 P:5 / B:292 O:0 / B:292 0.003181 0.944892 Del
164 147 2026-09-02 M:September / W:36 452/451 Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 205 P:7 / B:198 O:0 / B:198 0.003181 0.652198 Del
163 146 2026-09-02 M:September / W:36 446 Shift A P1.CU.9 11.60 x 910.00 x 1820.00 FA B4 G2 55 P:0 / B:55 O:0 / B:55 0.017556 0.965565 Del