Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
326 596 2.70 1220.00 2440.00 FA E2 CI D2 0 / 196
325 541 5.00 1220.00 2440.00 FA E2 CI D2 0 / 100
324 511 5.00 1220.00 2440.00 FA E2 CI D2 0 / 100
323 517 5.00 1220.00 2440.00 FA E2 CI D2 0 / 65
322 591//517 5.00 1220.00 2440.00 FA E2 CI D2 0 / 48
321 522 5.00 1220.00 2440.00 FA E2 CI D2 0 / 104
320 504 5.00 1220.00 2440.00 FA E2 CI D2 0 / 72
319 52//29 18.00 1220.00 2440.00 FM E1 UTY E 0 / 20
318 556 20.50 1220.00 2440.00 MA B4 G1 0 / 35
317 515 20.50 1220.00 2440.00 MA B4 G1 0 / 26

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
172 155 2026-09-02 M:September / W:36 346 Shift A P1.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 31 P:0 / B:31 O:0 / B:31 0.058048 1.799476 Del
171 154 2026-09-02 M:September / W:36 378 Shift A P1.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 30 P:0 / B:30 O:0 / B:30 0.058048 1.741428 Del
170 153 2026-09-02 M:September / W:36 235 Shift B P1.CU.10 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:18 / B:182 O:0 / B:182 0.003181 0.636291 Del
169 152 2026-09-02 M:September / W:36 263/210 Shift B P1.CU.10 2.40 x 915.00 x 1830.00 FJB E1 UTY E 301 P:7 / B:294 O:0 / B:294 0.003181 0.957618 Del
168 151 2026-09-02 M:September / W:36 263/x Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 176 P:3 / B:173 O:0 / B:173 0.003181 0.559936 Del
167 150 2026-09-02 M:September / W:36 317/x Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 220 P:4 / B:216 O:0 / B:216 0.003181 0.699920 Del
166 149 2026-09-02 M:September / W:36 431 Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:0 / B:200 O:0 / B:200 0.003181 0.636291 Del
165 148 2026-09-02 M:September / W:36 451/432 Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 297 P:5 / B:292 O:0 / B:292 0.003181 0.944892 Del
164 147 2026-09-02 M:September / W:36 452/451 Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 205 P:7 / B:198 O:0 / B:198 0.003181 0.652198 Del
163 146 2026-09-02 M:September / W:36 446 Shift A P1.CU.9 11.60 x 910.00 x 1820.00 FA B4 G2 55 P:0 / B:55 O:0 / B:55 0.017556 0.965565 Del